Operational Resilience Planning Methodology: "Your Toolkit" Series
BB OR [B] 13

[OR] [PM] [P3] [T] [S] Sustain Phase Maturity Assessment

The appendices bring the concepts discussed in A Practitioner’s Guide to the “Sustain” Phase into practical application.

New call-to-action

  • Introduce Change Management

  • Develop Communication Strategy 

  • Implement Training and Awareness

  • Provide Self-Assessment

  • Conduct an Independent Quality Review

The templates should be adapted to reflect the organisation’s size, complexity, regulatory environment, risk profile, governance structure, and operational resilience maturity.

x [OR] [3/4 Banner] A Practitioner’s Guide to the “Sustain” Phase

Moh Heng Goh
Operational Resilience Certified Planner-Specialist-Expert

[OR] [Full Banner] A Practitioner’s Guide to the “Sustain” Phase

Sustain Phase Appendices

x [OR] [PM] [T] [P3] Appendix S:

    • Introduce Change Management
    • Develop Communication Strategy 
    • Implement Training and Awareness
    • Provide Self-Assessment
    • Conduct an Independent Quality Review

The templates should be adapted to reflect the organisation’s size, complexity, regulatory environment, risk profile, governance structure, and operational resilience maturity.

Appendix S: Sustain Phase Maturity Assessment 

 

Dimension

Level 1

Level 2

Level 3

Level 4

Level 5

Culture

Reactive

Basic awareness

Defined behaviours

Embedded

Adaptive

Communication

Incident-driven

Developing

Structured

Measured

Predictive

Training

Informal

Basic

Role-based

Competency-managed

Continuously optimised

Self-assessment

Ad hoc

Developing

Defined

Evidence-based

Integrated and predictive

Independent Review

Limited

Periodic

Formal

Risk-based

Continuous assurance

Improvement

Reactive

Action-based

Structured

Measured

Enterprise-wide continuous improvement

Overall Maturity Interpretation

Level 1 — Initial
Operational resilience is largely reactive.

Level 2 — Developing
Core Sustain capabilities are emerging.

Level 3 — Defined
Sustain processes are formally established.

Level 4 — Managed
Performance is measured and actively governed.

Level 5 — Optimised
Operational resilience is embedded into strategy and continuously improved.

"Plan" Phase of the OR Planning Methodology

Assess Capability and Maturity Analyse Gap Develop Strategy and Roadmap Confirm Risk Appetite Develop and Embed Governance  
OR PM Plan Assess Capability and Maturity OR PM Plan Analyse Gap New call-to-action New call-to-action OR PM Develop and Embed Governance  

 

More Information About Blended Learning OR-5000 [BL-OR-5] or OR-300 [BL-OR-3]

Contact our course consultant colleagues to learn more about our blended learning program and about the next course's schedule.  They are the BL-OR-3 Blended Learning OR-300 Operational Resilience Implementer and the BL-OR-5 Blended Learning OR-5000 Operational Resilience Expert Implementer.

 

BL-OR-3 Register Now BL-OR-3_Tell Me More BL-OR-3_View Schedule
BL-OR-5_Register Now BL-OR-5_Tell Me More  [BL-OR] [3-4-5] View Schedule
[BL-OR] [3] FAQ OR-300

If you have any questions, click to contact us.Email to Sales Team [BCM Institute]

FAQ BL-OR-5 OR-5000
New call-to-action

New call-to-action

New call-to-action

 

Comments

 

More Posts

New Call-to-action