Chapter 3 listed 31 specific threats. This chapter builds on that register for the risk assessment in ISO 22301, clause 8.2.3. It sets the basis for the scoring in Chapter 5, which assesses current risk after existing controls. It also sets the basis for the mitigation strategies in Chapter 6.

[Logo] [BCM] Certification Transparent

Moh Heng Goh

Introduction

Identifying a threat does not show whether Singapore Aero Engine Services Private Limited (SAESL) is already protected against it. This chapter assesses the treatments and controls that apply, or could reasonably apply, to each threat in the Threat Register, and it records the gaps that remain.

New call-to-action

New call-to-action[BCM] [SAESL] [E3] [RAR] [T2] Treatment and Control

Chapter 3 listed 31 specific threats. This chapter builds on that register for the risk assessment in ISO 22301, clause 8.2.3. It sets the basis for the scoring in Chapter 5, which assesses current risk after existing controls. It also sets the basis for the mitigation strategies in Chapter 6.

 

 

Threat, risk treatment and control

A threat is the possible source of disruption. A risk treatment is the overall approach to managing the resulting risk. A control is a specific measure that carries out the treatment. For example, flood is the threat, risk reduction is the treatment, and a raised stores threshold is the control.

One threat often needs more than one treatment. Fire may call for reduction through detection and suppression, and transference through insurance. A treatment on paper is not a managed risk. The adequacy, ownership, testing and effectiveness of each control must also be considered.

The four treatment approaches

  • Risk avoidance: stopping, redesigning or not starting an activity so that the source of risk is removed. A routine preventive control is not avoidance unless the source disappears.
  • Risk reduction: lowering the likelihood, reducing the consequence or improving the ability to withstand the disruption, for example through redundancy, backup, cross-training or exercises.
  • Risk transference: sharing part of the financial, contractual or service-delivery consequence, for example through insurance or service-level agreements. It does not remove SAESL's accountability for essential services.
  • Risk acceptance: keeping a risk within approved appetite, with a documented decision, an approving authority, monitoring and review. Inaction on an unidentified control gap is not acceptance.

How the assessment was done

No control environment for SAESL was supplied as source material. Every control in Table RAR P2 is therefore an assumed existing control requiring validation, or an additional planned control. The table does not claim that SAESL has implemented any of them. The assumptions follow a typical Trent maintenance, repair and overhaul (MRO) organisation and the services on the SAESL website. Controls cover areas such as information technology (IT), closed-circuit television (CCTV), and uninterruptible power supply (UPS) systems, as well as recovery time objective (RTO) targets for IT recovery.

Status terms are used consistently. Avoidance uses Applicable, Partially Applicable, Not Applicable and Not Evidenced. Reduction states whether the treatment appears comprehensive, partially implemented, dependent on validation, or limited by a known gap. Controls carry a type: preventive, detective, corrective, directive, deterrent, compensating or recovery.

Summary Table

Table RAR P2: Treatment and Control for Singapore Aero Engine Services Private Limited

Threat Existing Risk Treatment – Risk Avoidance Existing Risk Treatment – Risk Reduction Existing Risk Treatment – Risk Transference Existing Risk Treatment – Risk Acceptance Existing Controls Additional Planned Controls

Flash Flood
(Denial of
Access –
Natural
Disaster)

Not Evidenced – Site-level flood exposure of stores and test areas has not been confirmed. Dependent on validation – Assumed drainage and raised-threshold protection; flood alert monitoring by facilities. Not Evidenced – Property insurance is assumed but scope for flood and business interruption needs confirmation. Accepted within approved risk appetite – Short access disruption may be accepted at departmental level; review annually. Site drainage and sump maintenance (preventive, assumed); weather alert monitoring by facilities (detective, assumed); stores contingency to lift stock off floor (corrective, assumed). Flood-vulnerability survey of stores and test areas, then raise or protect critical items. Owner: Facilities and Infrastructure Management; priority Medium; 6 months; evidence: survey report and closed actions.
Severe
Storm
(Denial
of Access
– Natural
Disaster)
Partially Applicable – Outdoor engine handling can be prohibited under severe-weather warnings. Partially implemented – Assumed severe-weather work-stop rules, secured loose items, building maintenance. Not Evidenced – Property insurance assumed; not confirmed for storm damage. Accepted within approved risk appetite – Short stoppages accepted; review annually. Weather warning monitoring (detective, assumed); outdoor work-stop instruction (directive, assumed); roof and crane inspection (preventive, assumed). Formalise a storm-warning stop-work procedure with named decision owner and exercise it. Owner: Safety Management System; priority Medium; 3 months; evidence: procedure and exercise record.

Lightning
Strike
(Denial of
Access –
Natural
Disaster)

Partially Applicable – Outdoor and exposed activities can be suspended during lightning warnings. Dependent on validation – Assumed earthing, lightning protection and surge protection on key equipment. Not Evidenced – Equipment insurance assumed; not confirmed. Accepted within approved risk appetite – Brief warning-related stoppages accepted. Lightning warning monitoring (detective, assumed); building earthing and surge protection (preventive, assumed); outdoor stop-work rule (directive, assumed). Test earthing and surge protection on test-facility and IT systems annually. Owner: Facilities and Infrastructure Management with Engineering Support and Technical Services; priority Medium; 6 months; evidence: test certificates.
Extreme
Heat
(Denial
of Access
– Natural
Disaster)
Not Applicable – the threat cannot be fully avoided; reduction and preparedness measures are required. Partially implemented – Assumed hydration, rest breaks and ventilation in work areas. Not Applicable – No meaningful transfer arrangement applies. Accepted within approved risk appetite – Residual discomfort accepted once heat-stress controls are confirmed. Heat-stress guidance and rest breaks (directive, assumed); hangar ventilation maintenance (preventive, assumed). Introduce a heat-stress index trigger with scheduled work adjustments. Owner: Safety Management System; priority Low; 3 months; evidence: procedure and trigger log.
Haze
(Denial
of Access
– Natural
Disaster)
Partially Applicable – Outdoor tasks can be rescheduled when air quality deteriorates. Dependent on validation – Assumed air-quality monitoring, masks and filter replacement. Not Applicable – No meaningful transfer arrangement applies. Accepted within approved risk appetite – Short episodes accepted; review each season. Air-quality monitoring (detective, assumed); mask stock and guidance (directive, assumed); filter maintenance (preventive, assumed). Set air-quality trigger levels for outdoor work, mask issue and filter changes. Owner: Safety Management System with Facilities and Infrastructure Management; priority Low; 3 months; evidence: trigger table.
Pandemic
-Related
Movement Restrictions
(Denial of
Access –
Natural
Disaster)
Not Applicable – the threat cannot be fully avoided; reduction and preparedness measures are required. Dependent on validation – Assumed split-team arrangements and remote working for support functions. Not Evidenced – No known transfer arrangement. Not appropriate for acceptance at the current exposure – Impact is High; acceptance would need senior management approval. Health and safe-distancing guidance (directive, assumed); remote-working for support teams (compensating, assumed); crisis communication channel (corrective, assumed). Define minimum safe staffing per production line and pre-approve split-shift rosters. Owner: Human Resource Management with MRO Operations; priority High; 4 months; evidence: roster playbook and desktop exercise.
Fire (Denial
of Access –
Man-made
Disaster)
Partially Applicable – Hot-work and flammable-material storage can be restricted by permit. Partially implemented – Assumed detection, suppression, compartmentation and evacuation arrangements. Not Evidenced – Property and business-interruption insurance is assumed; cover limits need confirmation. Not appropriate for acceptance at the current exposure – Impact is High or above. Fire detection and suppression (detective and corrective, assumed); hot-work permits (directive, assumed); evacuation plans and drills (corrective, assumed); flammable-store controls (preventive, assumed). Verify detection and suppression testing, fire compartments and hot-work permit compliance; add alternate-area plan for displaced production. Owner: Facilities and Infrastructure Management with Safety Management System; priority High; 6 months; evidence: test records and alternate-area plan.
Explosion
(Denial of
Access –
Man-made
Disaster)
Partially Applicable – Hazardous test conditions can be prohibited by test-cell procedure. Dependent on validation – Assumed pressure-system inspection, gas detection and test-cell safety interlocks. Not Evidenced – Insurance assumed; cover for catastrophic loss to be confirmed. Acceptance requires senior management approval – Only after safety controls are validated. Pressure-system inspection (preventive, assumed); gas and fuel leak detection (detective, assumed); test-cell interlocks and emergency shutdown (corrective, assumed). Define a test-capacity continuity option, such as a reciprocal or outsourced test arrangement. Owner: Engineering Support and Technical Services; priority Medium; 9 months; evidence: signed arrangement and capability review.
Chemical
Spill (Denial
of Access –
Man-made
Disaster)
Partially Applicable – Lower-hazard substitutes may be selected where practical. Partially implemented – Assumed bunding, spill kits, trained responders and handling procedures. Not Evidenced – Pollution liability cover assumed; to be confirmed. Temporarily accepted pending remediation – Minor residual exposure accepted after controls are confirmed. Bunded storage and spill kits (preventive and corrective, assumed); chemical handling procedures (directive, assumed); trained emergency responders (corrective, assumed). Run quarterly spill-response drills and audit bunding. Owner: Environmental and Sustainability Management; priority Medium; 6 months; evidence: drill reports.
Bomb Threat
(Denial of
Access –
Man-made
Disaster)
Not Applicable – the threat cannot be fully avoided; reduction and preparedness measures are required. Partially implemented – Assumed threat-call procedure, access control and evacuation routes. Not Applicable – No meaningful transfer arrangement applies. Accepted within approved risk appetite – Residual exposure accepted subject to annual exercise. Bomb-threat call checklist (directive, assumed); visitor and vehicle access control (preventive, assumed); evacuation drills (corrective, assumed). Exercise a bomb-threat evacuation and re-entry scenario once a year. Owner: Security Management; priority Low; 6 months; evidence: exercise report.
Terrorism
(Denial of
Access –
Man-made
Disaster)
Not Applicable – the threat cannot be fully avoided; reduction and preparedness measures are required. Dependent on validation – Assumed perimeter security, access control, CCTV and security awareness. Not Evidenced – Terrorism cover under property insurance not confirmed. Not appropriate for acceptance at the current exposure – Impact is Very High. Perimeter and access control (preventive, assumed); CCTV and guard force (detective, assumed); security-incident escalation to authorities (corrective, assumed). Commission an independent security review and confirm terrorism insurance cover. Owner: Security Management; priority Medium; 6 months; evidence: review report and cover confirmation.
Road
Closure
(Denial of
Access –
Man-made
Disaster)
Not Applicable – the threat cannot be fully avoided; reduction and preparedness measures are required. Partially implemented – Assumed flexible shift start and alternate delivery times. Not Applicable – No meaningful transfer arrangement applies. Accepted within approved risk appetite – Low impact; review annually. Traffic alert monitoring (detective, assumed); flexible shift start (compensating, assumed). Publish alternate routes and a delivery-rescheduling rule. Owner: Logistics and Transportation Coordination; priority Low; 3 months; evidence: published guidance.
Pandemic (Unavailability
of People)
Not Applicable – the threat cannot be fully avoided; reduction and preparedness measures are required. Dependent on validation – Assumed health protocols, vaccination encouragement, remote working for support functions. Not Evidenced – No known transfer arrangement. Not appropriate for acceptance at the current exposure – Impact is High. Illness reporting and health protocols (directive, assumed); remote working for support teams (compensating, assumed); crisis communication (corrective, assumed). Cross-skill technicians on critical tasks and set a pandemic trigger plan. Owner: Human Resource Management with Training and Competency Management; priority High; 6 months; evidence: skills matrix and trigger plan.
Industrial
Action
(Unavailability
of People)
Not Evidenced – Avoidance relies on good employee relations, which are not evidenced here. Dependent on validation – Assumed employee engagement and grievance channels. Not Applicable – No meaningful transfer arrangement applies. Acceptance may be appropriate only after additional controls are implemented – Rare event; acceptance at executive level. Employee engagement forums and grievance process (preventive, assumed); executive contingency escalation (corrective, assumed). Document an industrial-action response plan with legal guidance. Owner: Human Resource Management with Legal, Risk and Corporate Governance; priority Low; 6 months; evidence: plan.
Loss of Key Personnel (Unavailability of People) Not Applicable – the threat cannot be fully avoided; reduction and preparedness measures are required. Partially implemented – Assumed deputies and handover practices. Not Evidenced – No known transfer arrangement. Not appropriate for acceptance at the current exposure – Authorisation constraints are a legal matter. Named deputies (compensating, assumed); handover procedures (directive, assumed); retention practices (preventive, assumed). Maintain a succession map for authorised roles with at least one trained backup per critical authorisation. Owner: Training and Competency Management; priority High; 6 months; evidence: succession map.
Skills Shortage (Unavailability
of People)
Not Applicable – the threat cannot be fully avoided; reduction and preparedness measures are required. Partially implemented – Assumed training programmes and recruitment channels. Partially Applicable – Subcontracted or temporary labour may supplement capacity. Not appropriate for acceptance at the current exposure – Impact is High. Training and competency programmes (preventive, assumed); recruitment and retention practices (preventive, assumed); overtime and subcontract options (compensating, assumed). Link workforce forecast to overhaul capacity plan with quarterly review. Owner: Human Resource Management; priority High; 4 months; evidence: forecast and review minutes.
Industrial
Accident (Unavailability
of People)
Partially Applicable – High-risk tasks can be stopped or redesigned. Partially implemented – Assumed risk assessments, permits, training and personal protective equipment. Not Evidenced – Employer liability cover assumed; not confirmed. Not appropriate for acceptance at the current exposure – Impact is Very High. Safety Management System procedures (directive, assumed); permit-to-work (preventive, assumed); incident reporting (detective, assumed). Introduce near-miss trend review and critical-task safety verification. Owner: Safety Management System; priority High; 4 months; evidence: monthly review records.
Staff Fatigue (Unavailability
of People)
Partially Applicable – Maximum-hours rules can prohibit unsafe rosters. Dependent on validation – Assumed rostering limits and supervisory checks. Not Applicable – No meaningful transfer arrangement applies. Not appropriate for acceptance at the current exposure – Safety and quality consequences are High. Rostering limits (preventive, assumed); independent inspection of critical tasks (detective, assumed); fatigue awareness training (directive, assumed). Introduce a fatigue-risk indicator with monthly review and roster escalation. Owner: Human Resource Management with Safety Management System; priority High; 4 months; evidence: indicator and review records.
Supplier
Failure
(Disruption
to the Supply
Chain)
Partially Applicable – Sole-source dependence can be reduced where alternative approved sources exist. Partially implemented – Assumed safety stock, supplier monitoring and expediting. Partially Applicable – Contractual delivery commitments and penalties may apply. Not appropriate for acceptance at the current exposure – Delays directly affect customers. Safety stock of high-use parts (compensating, assumed); supplier performance review (detective, assumed); expediting (corrective, assumed). Identify critical parts and set minimum stock and alternate-source triggers. Owner: Supply Chain and Spare Parts Management; priority High; 4 months; evidence: critical-parts list.
Single
Source
Dependency (Disruption
to the Supply
Chain)
Partially Applicable – Where permitted, a second approved source may be qualified. Dependent on validation – Assumed supplier relationship management and stock buffers. Partially Applicable – Long-term supply agreements may share risk. Acceptance requires senior management approval – Only where no alternative exists. Long-term agreements (compensating, assumed); buffer stock (compensating, assumed); supplier relationship meetings (preventive, assumed). Map single-source items and agree a continuity clause or buffer with the approving party. Owner: Procurement and Vendor Management; priority High; 6 months; evidence: dependency map and clauses.
Logistics
Disruption (Disruption
to the Supply
Chain)
Not Applicable – the threat cannot be fully avoided; reduction and preparedness measures are required. Partially implemented – Assumed multiple carriers and freight forwarders. Partially Applicable – Carrier contracts and cargo insurance may apply. Accepted within approved risk appetite – Short delays accepted. Multiple freight forwarders (compensating, assumed); shipment tracking (detective, assumed); cargo insurance (compensating, assumed). Pre-qualify backup carriers and routes for engines and critical parts. Owner: Logistics and Transportation Coordination; priority Medium; 4 months; evidence: contracts and route plan.
Import
Restrictions (Disruption
to the Supply
Chain)
Partially Applicable – Sourcing can avoid restricted origins where alternatives exist. Dependent on validation – Assumed trade-compliance checks and customs brokers. Not Applicable – No meaningful transfer arrangement applies. Acceptance requires senior management approval – Compliance matters need executive oversight. Trade-compliance checks (preventive, assumed); customs broker relationships (corrective, assumed); legal review (directive, assumed). Set up a trade-compliance watch with defined escalation and an alternate routing plan. Owner: Legal, Risk and Corporate Governance with Supply Chain and Spare Parts Management; priority Medium; 4 months; evidence: watch log.
Third-Party
Cyber Incident (Disruption
to the Supply
Chain)
Partially Applicable – High-risk connections can be removed or segmented. Dependent on validation – Assumed segmentation and supplier security reviews. Partially Applicable – Contract security clauses and cyber insurance may share risk. Not appropriate for acceptance at the current exposure – Impact is High. Network segmentation (preventive, assumed); supplier security questionnaires (directive, assumed); monitoring of external connections (detective, assumed). Risk-tier suppliers and require security assurance for the top tier. Owner: Cybersecurity Operations with Procurement and Vendor Management; priority High; 6 months; evidence: tiered register and assurance reports.
Vendor
Insolvency (Disruption
to the Supply
Chain)
Partially Applicable – Concentrated reliance on weak vendors can be avoided. Partially implemented – Assumed vendor due diligence at onboarding. Partially Applicable – Contractual title and release clauses may apply. Accepted within approved risk appetite – Where alternatives exist. Vendor due diligence (preventive, assumed); contract termination terms (directive, assumed). Add financial-health monitoring for critical vendors with release-of-parts clauses. Owner: Procurement and Vendor Management; priority Medium; 6 months; evidence: monitoring reports.
Ransomware (Equipment
and IT-Related Disruption)
Partially Applicable – Unsupported software and exposed services can be removed. Partially implemented – Assumed endpoint protection, email filtering, patching and backups. Partially Applicable – Cyber insurance and managed security services may apply. Not appropriate for acceptance at the current exposure – Impact is Very High. Endpoint protection and email filtering (preventive, assumed); security monitoring (detective, assumed); backup and restore (recovery, assumed). Introduce immutable offline backups, quarterly restore tests and a ransomware playbook. Owner: Cybersecurity Operations with Information Technology Services; priority High; 4 months; evidence: restore test reports and playbook.
Data Breach (Equipment
and IT-Related Disruption)
Partially Applicable – Unnecessary data collection and retention can be stopped. Partially implemented – Assumed access control, encryption and data-loss prevention. Partially Applicable – Cyber insurance may cover breach costs. Not appropriate for acceptance at the current exposure – Legal and reputational impact is Very High. Access control and encryption (preventive, assumed); log monitoring (detective, assumed); breach notification procedure (corrective, assumed). Classify data and run access reviews on critical systems twice a year. Owner: Cybersecurity Operations with Engineering Information and Document Management; priority High; 6 months; evidence: classification and review records.
Network
Failure
(Equipment
and IT-Related Disruption)
Not Applicable – the threat cannot be fully avoided; reduction and preparedness measures are required. Dependent on validation – Assumed redundant links and monitoring. Partially Applicable – Carrier service levels may apply. Accepted within approved risk appetite – Short outages accepted. Redundant network links (compensating, assumed); network monitoring (detective, assumed); spare equipment (corrective, assumed). Test failover each year and document manual workarounds. Owner: Information Technology Services; priority Medium; 6 months; evidence: failover test report.
Teleco-
Communications Failure (Equipment and IT-Related Disruption)
Not Applicable – the threat cannot be fully avoided; reduction and preparedness measures are required. Partially implemented – Assumed dual carrier or mobile backup. Partially Applicable – Carrier service levels may apply. Accepted within approved risk appetite – Low rating. Secondary carrier or mobile backup (compensating, assumed); crisis contact list (corrective, assumed). Confirm dual-carrier diversity and test crisis contact list. Owner: Information Technology Services; priority Low; 4 months; evidence: diversity confirmation.
Power Failure (Equipment and IT-Related Disruption) Not Applicable – the threat cannot be fully avoided; reduction and preparedness measures are required. Dependent on validation – Assumed UPS and standby generators for key loads. Not Evidenced – Business-interruption cover assumed; not confirmed. Accepted within approved risk appetite – Short outages accepted. UPS for IT (compensating, assumed); standby generator for key loads (compensating, assumed); load-shedding plan (corrective, assumed). Verify generator coverage of test facility and critical loads under load test. Owner: Facilities and Infrastructure Management; priority Medium; 6 months; evidence: load test report.
Application Failure (Equipment and IT-Related Disruption) Partially Applicable – Unsupported applications can be retired. Partially implemented – Assumed change control and vendor support. Partially Applicable – Vendor support agreements may apply. Not appropriate for acceptance at the current exposure – Impact is High. Change management (preventive, assumed); vendor support agreements (corrective, assumed); backup of application data (recovery, assumed). Document manual workarounds and recovery runbooks for critical applications. Owner: Information Technology Services with Engineering Information and Document Management; priority High; 4 months; evidence: runbooks and drill.
Data Centre Outage (Equipment and IT-Related Disruption) Partially Applicable – Single-site hosting can be removed. Dependent on validation – Assumed disaster recovery site or cloud region failover. Partially Applicable – Hosting contract commitments may apply. Not appropriate for acceptance at the current exposure – Impact is Very High. Disaster recovery site or replication (recovery, assumed); hosting service levels (compensating, assumed); backup (recovery, assumed). Run an annual disaster recovery failover test against RTO targets. Owner: Information Technology Services; priority High; 6 months; evidence: test results.

What the assessment shows

Across the 31 threats, avoidance is rarely realistic: 12 threats are marked Not Applicable because they cannot be fully avoided, and 17 are Partially Applicable. Reduction is the main treatment. The reduction status depends on validation for 15 threats and partial implementation for 16 threats, so none can yet be called comprehensive.

Planned controls are specific: each names a functional owner, a priority and a timeframe. Of the 31 planned controls, 14 are High priority, 11 Medium and 6 Low. Typical examples include testing immutable backups for ransomware, mapping single-source parts, and a succession map for authorised staff.

Governing risk acceptance

Where acceptance is assumed, it must be informed and documented, with an approving authority, a review frequency and a trigger for reconsideration. SAESL should record departmental-level acceptance for minor, short disruptions and escalate any acceptance of high-impact exposure to senior management. A significant control weakness should never be accepted in place of a fix.

New call-to-action

Conclusion

This chapter separates the controls that SAESL is assumed to have from those it still needs. Reduction carries most of the weight, the existing controls need validation, and each gap has a planned control with an owner. SAESL should validate the assumed controls with their owners, test those that require testing, and formally record any acceptance.

The next chapter scores each threat for impact, likelihood and disruption period, using the controls recorded here.

Continue reading: Chapter 5, Risk Impact and Likelihood Assessment for Singapore Aero Engine Services Private Limited, scores each threat for impact, likelihood and expected disruption period to prioritise management action.

Building Resilient Operations: Implementing Business Continuity Management at SAESL
eBook 3: Starting Your BCM Implementation
C1 C2 C3
[BCM] [SAESL] [E3] [BIA] MBCO Corporate MBCO [BCM] [SAESL] [E3] [BIA] [PS] Key Product and Services [BCM] [SAESL] [E3] [RAR] [T1] List of Threats
C4 C5 C6
[BCM] [SAESL] [E3] [RAR] [T2] Treatment and Control [BCM] [SAESL] [E3] [RAR] [T3] Risk Impact and Likelihood Assessment [BCM] [SAESL] [E3] [BCS] [T1] Mitigation Strategies and Justification
 

Comments

CTA Banner_OR

CTA Banner_ORA

CTA Banner_BCM

CTA Banner_ITDR

CTA Banner_CM