title: "[OR] [BJB] [E2] [C4] Analysing Gaps Stage of OR Plan Phase for Bank Julius Baer"
description: "A five-step gap analysis for Bank Julius Baer: scope, requirements, risk assessment, gap register and action plan, with illustrative Singapore examples."
image: https://blog.bcm-institute.org/hubfs/BJB%20Graphic%20Folder/BJB%20Morepost/BJB%20E2%20Morepost/%5BOR%5D%20%5BBJB%5D%20%5BE2%5D%20%5BP1%5D%20%5BS2%5D%20%5BC4%5D%20Analysing%20Gaps.jpg
---

[![BCMIWhiteLogo.png](https://blog.bcm-institute.org/hs-fs/hubfs/Blog%20Testing/BCMIWhiteLogo.png?width=556&name=BCMIWhiteLogo.png "BCMIWhiteLogo.png")](http://www.bcm-institute.org/)

- [Home](https://www.bcm-institute.org/)
- [About Us](https://www.bcm-institute.org/about-us-3/) 
    - [A President’s Perspective](https://www.bcm-institute.org/about-us/a-presidents-perspective/)
    - [Our History](https://www.bcm-institute.org/about-us/our-history/)
    - [Our Advisory Council](https://www.bcm-institute.org/about-us/our-advisory-council/)
    - [Customers’ Testimonials](https://www.bcm-institute.org/about-us/customers-testimonials/)
    - [Credential Verification](https://www.bcm-institute.org/about-us/credential-verification/)
- [Courses](https://blog.bcm-institute.org/blog/course-fees-for-blended-learning-courses-master-catalog) 
    - [ISO 22301 Business Continuity Management System Audit](https://blog.bcm-institute.org/audit/business-continuity-management-audit-courses)
    - [ISO 22301 Business Continuity Management](https://blog.bcm-institute.org/bcm/business-continuity-management-courses)
    - [Crisis Communication](https://blog.bcm-institute.org/crisis-communication/crisis-communication-courses)
    - [Crisis Management](https://blog.bcm-institute.org/en/crisis-management/courses)
    - [IT Disaster Recovery](https://blog.bcm-institute.org/it-disaster-recovery/courses)
    - [Operational Resilience](https://blog.bcm-institute.org/operational-resilience/courses)
    - [Operational Resilience Audit](https://blog.bcm-institute.org/operational-resilience-audit/courses)
- [Certification](https://blog.bcm-institute.org/certification/types-of-certifications-offered) 
    - [ISO 22301 BCMS Audit Certification](https://blog.bcm-institute.org/certification/business-continuity-management-audit-certification)
    - [ISO22301 Business Continuity Management Certification](https://blog.bcm-institute.org/bcm/business-continuity-management-certification)
    - [Crisis Communication Certification](https://blog.bcm-institute.org/crisis-communication/crisis-communication-certification)
    - [Crisis Management Certification](https://blog.bcm-institute.org/en/crisis-management/crisis-management-certification)
    - [IT Disaster Recovery Planning Certification](https://blog.bcm-institute.org/it-disaster-recovery/it-disaster-recovery-certification)
    - [Operational Resilience Certification](https://blog.bcm-institute.org/operational-resilience/operational-resilience-certification)
    - [Operational Resilience Audit Certification](https://blog.bcm-institute.org/operational-resilience-audit)
- [Seminars](https://blog.bcm-institute.org/meet-the-expert/mte-webinar-mainpage)
- [Store](https://www.bcm-institute.org/store-2/)
- [Contact Us](http://www.bcm-institute.org/about-us/contact-us/)

- <https://www.facebook.com/BCMInstitute/>
- <https://www.linkedin.com/company/business-continuity-management-institute-bcm-institute>

###### Building Operational Resilience at Bank Julius Baer: A Strategic Implementation Guide

![\[BB\] \[Ins\] Storm-Protected Smart Home](https://blog.bcm-institute.org/hs-fs/hubfs/BB%20Insurance/BB%20Insurance%20V2%202026/%5BBB%5D%20%5BIns%5D%20Storm-Protected%20Smart%20Home.png?width=1677&height=938&name=%5BBB%5D%20%5BIns%5D%20Storm-Protected%20Smart%20Home.png "[BB] [Ins] Storm-Protected Smart Home")

# \[OR\] \[BJB\] \[E2\] \[C4\] Analysing Gaps Stage of OR Plan Phase for Bank Julius Baer

[![\[OR\] \[BJB\] \[Full Banner\] Strengthening Banking Resilience A Practical Guide for Bank Julius Baer](https://no-cache.hubspot.com/cta/default/3893111/e929c6dc-a612-428f-b369-59f1b149ace1.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/e929c6dc-a612-428f-b369-59f1b149ace1)A baseline only becomes useful when it is compared with something.

The Analyse Gap stage of the Plan phase compares Bank Julius Baer's (BJB's) current resilience with what regulators expect and what the bank itself wants to achieve.

The comparison produces a list of gaps, their causes and the steps needed to close them. It is sometimes called a needs analysis.

[![Analysing Gap](https://no-cache.hubspot.com/cta/default/3893111/09f3d9d6-e962-483c-a700-efdafda32260.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/09f3d9d6-e962-483c-a700-efdafda32260)[![\[Logo\] \[OR\] Certification Transparent](https://no-cache.hubspot.com/cta/default/3893111/09ce1ea0-4d44-4deb-867f-2e2b1b867768.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/09ce1ea0-4d44-4deb-867f-2e2b1b867768)

[Moh Heng Goh](https://blog.bcm-institute.org/or-v2/author/moh-heng-goh) Nov 19, 2026

## [![BJB Legal Disclaimer Banner](https://no-cache.hubspot.com/cta/default/3893111/76215f61-1d28-496b-9b19-d5146352e15d.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/76215f61-1d28-496b-9b19-d5146352e15d)[![Analysing Gap](https://no-cache.hubspot.com/cta/default/3893111/09f3d9d6-e962-483c-a700-efdafda32260.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/09f3d9d6-e962-483c-a700-efdafda32260)

## Introduction

[![\[OR\] \[BJB\] \[E2\] \[P1\] \[S2\] \[C4\] Analysing Gaps](https://no-cache.hubspot.com/cta/default/3893111/e8395c19-5a7a-4e70-9096-e2ee8e4db0b5.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/e8395c19-5a7a-4e70-9096-e2ee8e4db0b5)A baseline only becomes useful when it is compared with something. The Analyse Gap stage of the Plan phase compares Bank Julius Baer's (BJB's) current resilience with what regulators expect and what the bank itself wants to achieve. The comparison produces a list of gaps, their causes and the steps needed to close them. It is sometimes called a needs analysis.

## Purpose of the Chapter

This chapter shows how BJB can run a gap analysis in five steps and what a usable gap register looks like. After reading it you should be able to scope the analysis, choose the reference requirements, describe each gap in specific terms and hand a prioritised action plan to the roadmap stage.

## Implementation Steps

### Step 1: Define Scope and Objectives

Decide which operations are in scope and what the analysis must deliver. A narrow scope keeps the work finishable.

*Illustrative example:* BJB Singapore scopes the first analysis to client-facing operations: onboarding, payments, trading and settlement, custody and lending. Corporate functions follow in a later cycle.

### Step 2: Identify Relevant Standards and Regulations

List the requirements the bank is measured against. For a Singapore bank this includes MAS guidelines and notices on business continuity, technology risk and outsourcing, and international standards such as ISO 22301 and ISO 27001. Because BJB belongs to a Swiss group, Group policy and Swiss supervisory expectations may also apply **\[verify which instruments apply to the Singapore branch\]**.

*Illustrative example:* the team builds a requirements matrix with one row per obligation, the clause reference and the internal policy that responds to it.

### Step 3: Conduct a Risk Assessment

Identify disruptive events, their likelihood and impact, and existing controls. This identifies threats and vulnerabilities that sit behind the gaps.

*Illustrative example:* cyber attack on a third-party platform, loss of a data centre, staff unavailability during a pandemic-type event, and failure of a payment network are rated and mapped to existing controls.

### Step 4: Perform the Gap Analysis

Compare findings with current policies, procedures and controls. Use a simple template with five columns: current state, future state, description of the gap, root cause and possible solutions.

*Illustrative example:* the current state is that recovery objectives are set per application. The future state is that objectives are set per service and tested end to end. The gap is the absence of service-level tolerances. The root cause is that planning followed the system inventory. The possible solutions are to extend the business impact analysis to services or to introduce a service catalogue.

### Step 5: Develop an Action Plan

Turn each gap into an initiative with an owner, a date and a milestone. Prioritise by impact and feasibility.

*Illustrative example:* the head of operational risk owns the service catalogue initiative for the end of the second quarter, with a milestone for the first three services in the first quarter.

## Making the Register Useful

Keep each gap to one line of description and one owner. Link it to the requirement it relates to so the register doubles as evidence for a supervisor. Review it every quarter, close what is done and add what is new. A register that is never updated quickly becomes a record of intentions.

## Writing a Good Gap Statement

A gap statement should be short, specific and testable. "Resilience is not embedded" is not a gap statement. "Recovery objectives are set for applications but not for the client-facing services they support, so the bank cannot show that CBS-2 Client Payments and Cash Transfers can be recovered end to end" is. A good statement names the current state, the target state, the evidence for the difference and the requirement it relates to. It also includes a root cause, because fixing symptoms leads to the same gap reappearing a year later.

## Prioritising Gaps

Not every gap deserves immediate action. A simple scoring method rates each gap for the impact on clients, the regulatory exposure and the effort to close it, then ranks them. Gaps that are high in impact and low in effort go first. Gaps that are high in impact and high in effort go into the roadmap with a sponsor and a budget. Low-impact gaps are accepted explicitly by the risk owner, with a date to review. This produces a defensible record of why some items were deferred, which a supervisor will want to see.

*Illustrative gap register extract:*

- **Gap 1:** no service catalogue. Root cause: planning followed the system inventory. Priority: high. Owner: head of operational risk.
- **Gap 2:** material third parties not linked to services. Root cause: vendor register built for procurement. Priority: high. Owner: head of vendor management.
- **Gap 3:** no integrated test of payment recovery. Root cause: tests were run by individual teams. Priority: medium. Owner: head of payments operations.

## Linking the Register to Evidence

Each gap should link to the document, test or assessment that evidences it, and each closure should link to proof that the change was made. The register then serves as an audit trail. Review it monthly in the resilience forum for the first year, then quarterly, and report the number of open, closed and overdue items to the board as one of the programme indicators.

## Summary Table

| **Step** | **Activity** | **Output** |
| --- | --- | --- |
| **1** | **Define scope and objectives** | **Agreed scope** |
| **2** | **Identify standards and regulations** | **Requirements matrix** |
| **3** | **Conduct risk assessment** | **Threat and vulnerability list** |
| **4** | **Perform gap analysis** | **Gap register** |
| **5** | **Develop action plan** | **Owned and dated actions** |

## [![\[Banner\] \[Summing\] \[OR\] \[E2\] \[C4\] Analysing Gaps](https://no-cache.hubspot.com/cta/default/3893111/9cd6cbcd-5b03-46c5-95be-53a06547266f.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/9cd6cbcd-5b03-46c5-95be-53a06547266f)Conclusion

The gap register is the link between what BJB knows about itself and what it must change. It gives the roadmap stage a list that is specific, owned, and tied to requirements.

## Sources

- [Analyse Gap in Operational Resilience](https://blog.bcm-institute.org/operational-resilience/analyse-gap-in-operational-resilience), BCM Institute
- Monetary Authority of Singapore, Guidelines on Business Continuity Management; Notice on Technology Risk Management; Guidelines on Outsourcing **\[verify current editions\]**

**Continue reading:** Chapter 5, *Developing Strategy and Roadmap of OR Plan Phase for Bank Julius Baer*, sequences the gaps into a funded roadmap.

 

[![\[OR\] \[BJB\] \[34 Banner\] Strengthening Banking Resilience A Practical Guide for Bank Julius Baer](https://no-cache.hubspot.com/cta/default/3893111/00cdca0d-a0af-4bc5-972d-ee3caa7a94e4.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/00cdca0d-a0af-4bc5-972d-ee3caa7a94e4)

| **eBook 2: Implementing Operational Resilience for Bank Julius Baer** |  |  |  |
| --- | --- | --- | --- |
| **C1** | **C2** | **C8** | **C14** |
| [![\[OR\] \[BJB\] \[E2\] \[C1\] OR Planning Methodology](https://no-cache.hubspot.com/cta/default/3893111/3d6383a7-3d72-453d-a290-961ba27ab5c3.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/3d6383a7-3d72-453d-a290-961ba27ab5c3) | [![\[OR\] \[BJB\] \[E2\] \[P1\] \[S1-S5\] \[C2\] Five Stages of the \_Plan\_ Phase](https://no-cache.hubspot.com/cta/default/3893111/c8556221-4983-4862-ae1d-469687b348eb.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/c8556221-4983-4862-ae1d-469687b348eb) | [![\[OR\] \[BJB\] \[E2\] \[P2\] \[S1-S5\] \[C8\] Five Stages of the \_Implement\_ Phase](https://no-cache.hubspot.com/cta/default/3893111/5950274f-db27-46d5-93a8-728b5b0c071c.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/5950274f-db27-46d5-93a8-728b5b0c071c) | [![\[OR\] \[BJB\] \[E2\] \[P3\] \[C14\] The Five Stages of the \_Sustain\_ Phase](https://no-cache.hubspot.com/cta/default/3893111/53ad46fa-2ebc-48b0-9ec6-5d5dd7b6d203.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/53ad46fa-2ebc-48b0-9ec6-5d5dd7b6d203) |

 

|  | **"Plan" Phase of the Operational Resilience Planning Methodology** |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- |
|  | **C2** | **C3** | **C4** | **C5** | **C6** | **C7** |
| [![New call-to-action](https://no-cache.hubspot.com/cta/default/3893111/f2a29754-d200-4bab-9802-6081ca800251.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/f2a29754-d200-4bab-9802-6081ca800251) | [![\[OR\] \[BJB\] \[E2\] \[P1\] \[S1-S5\] \[C2\] Five Stages of the \_Plan\_ Phase](https://no-cache.hubspot.com/cta/default/3893111/c8556221-4983-4862-ae1d-469687b348eb.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/c8556221-4983-4862-ae1d-469687b348eb) | [![\[OR\] \[BJB\] \[E2\] \[P1\] \[S1\] \[C3\] Assessing Capability and Maturity](https://no-cache.hubspot.com/cta/default/3893111/4cd0dd3f-1081-4670-a853-e05a53d95e2e.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/4cd0dd3f-1081-4670-a853-e05a53d95e2e) | [![\[OR\] \[BJB\] \[E2\] \[P1\] \[S2\] \[C4\] Analysing Gaps](https://no-cache.hubspot.com/cta/default/3893111/e8395c19-5a7a-4e70-9096-e2ee8e4db0b5.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/e8395c19-5a7a-4e70-9096-e2ee8e4db0b5) | [![\[OR\] \[BJB\] \[E2\] \[P1\] \[S3\] \[C5\] Developing Strategy and Roadmap](https://no-cache.hubspot.com/cta/default/3893111/3596e489-0be7-480e-a94e-1155f9afb724.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/3596e489-0be7-480e-a94e-1155f9afb724) | [![\[OR\] \[BJB\] \[E2\] \[P1\] \[S4\] \[C6\] Confirming Risk Appetite](https://no-cache.hubspot.com/cta/default/3893111/e1802b7e-acfe-4309-bd52-64d640098f9e.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/e1802b7e-acfe-4309-bd52-64d640098f9e) | [![\[OR\] \[BJB\] \[E2\] \[P1\] \[S5\] \[C7\] Developing and Embedding Governance](https://no-cache.hubspot.com/cta/default/3893111/68152885-b3fe-46bf-9c72-5a0298ad257a.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/68152885-b3fe-46bf-9c72-5a0298ad257a) |

 

## **Comments**

![CTA Banner\_OR](https://blog.bcm-institute.org/hubfs/CTA%20Banner%20for%20Blog/CTA%20Banner_OR.jpg "CTA Banner_OR")

---

![CTA Banner\_ORA](https://blog.bcm-institute.org/hubfs/CTA%20Banner%20for%20Blog/CTA%20Banner_ORA.jpg "CTA Banner_ORA")

---

![CTA Banner\_BCM](https://blog.bcm-institute.org/hubfs/CTA%20Banner%20for%20Blog/CTA%20Banner_BCM.jpg "CTA Banner_BCM")

---

![CTA Banner\_ITDR](https://blog.bcm-institute.org/hubfs/CTA%20Banner%20for%20Blog/CTA%20Banner_ITDR.jpg "CTA Banner_ITDR")

---

![CTA Banner\_CM](https://blog.bcm-institute.org/hubfs/CTA%20Banner%20for%20Blog/CTA%20Banner_CM.jpg "CTA Banner_CM")

![BCMIWhiteLogoSmall.png](https://blog.bcm-institute.org/hs-fs/hubfs/Blog%20Testing/BCMIWhiteLogoSmall.png?width=72&name=BCMIWhiteLogoSmall.png "BCMIWhiteLogoSmall.png")

All rights reserved. Copyright 2026

```json
{
  "@context" : "https://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Moh Heng Goh",
    "url" : "https://blog.bcm-institute.org/or-v2/author/moh-heng-goh"
  },
  "dateModified" : "2026-11-19T01:45:47.602Z",
  "datePublished" : "2026-11-19T01:45:29.000Z",
  "headline" : "[OR] [BJB] [E2] [C4] Analysing Gaps Stage of OR Plan Phase for Bank Julius Baer",
  "image" : [ "https://blog.bcm-institute.org/hubfs/BJB%20Graphic%20Folder/BJB%20Morepost/BJB%20E2%20Morepost/%5BOR%5D%20%5BBJB%5D%20%5BE2%5D%20%5BP1%5D%20%5BS2%5D%20%5BC4%5D%20Analysing%20Gaps.jpg" ],
  "mainEntityOfPage" : {
    "@id" : "https://blog.bcm-institute.org/or-v2/or-bjb-e2-chapter-4-analysing-gaps-stage-of-or-plan-phase-for-bank-julius-baer",
    "@type" : "WebPage"
  },
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "url" : "https://blog.bcm-institute.org/hubfs/BCMI%20Logo.png"
    },
    "name" : "BCMI Pte Ltd"
  }
}
```