title: "[OR] [BJB] [E2] [C14] Bank Julius Baer's Sustain Phase of the Operational Resilience Planning Methodology"
description: "An introduction to the five Sustain phase stages at Bank Julius Baer: culture, communication, training, self-assessment and independent review."
image: https://blog.bcm-institute.org/hubfs/BJB%20Graphic%20Folder/BJB%20Morepost/BJB%20E2%20Morepost/%5BOR%5D%20%5BBJB%5D%20%5BE2%5D%20%5BP3%5D%20%5BC14%5D%20The%20Five%20Stages%20of%20the%20_Sustain_%20Phase.jpg
---

[![BCMIWhiteLogo.png](https://blog.bcm-institute.org/hs-fs/hubfs/Blog%20Testing/BCMIWhiteLogo.png?width=556&name=BCMIWhiteLogo.png "BCMIWhiteLogo.png")](http://www.bcm-institute.org/)

- [Home](https://www.bcm-institute.org/)
- [About Us](https://www.bcm-institute.org/about-us-3/) 
    - [A President’s Perspective](https://www.bcm-institute.org/about-us/a-presidents-perspective/)
    - [Our History](https://www.bcm-institute.org/about-us/our-history/)
    - [Our Advisory Council](https://www.bcm-institute.org/about-us/our-advisory-council/)
    - [Customers’ Testimonials](https://www.bcm-institute.org/about-us/customers-testimonials/)
    - [Credential Verification](https://www.bcm-institute.org/about-us/credential-verification/)
- [Courses](https://blog.bcm-institute.org/blog/course-fees-for-blended-learning-courses-master-catalog) 
    - [ISO 22301 Business Continuity Management System Audit](https://blog.bcm-institute.org/audit/business-continuity-management-audit-courses)
    - [ISO 22301 Business Continuity Management](https://blog.bcm-institute.org/bcm/business-continuity-management-courses)
    - [Crisis Communication](https://blog.bcm-institute.org/crisis-communication/crisis-communication-courses)
    - [Crisis Management](https://blog.bcm-institute.org/en/crisis-management/courses)
    - [IT Disaster Recovery](https://blog.bcm-institute.org/it-disaster-recovery/courses)
    - [Operational Resilience](https://blog.bcm-institute.org/operational-resilience/courses)
    - [Operational Resilience Audit](https://blog.bcm-institute.org/operational-resilience-audit/courses)
- [Certification](https://blog.bcm-institute.org/certification/types-of-certifications-offered) 
    - [ISO 22301 BCMS Audit Certification](https://blog.bcm-institute.org/certification/business-continuity-management-audit-certification)
    - [ISO22301 Business Continuity Management Certification](https://blog.bcm-institute.org/bcm/business-continuity-management-certification)
    - [Crisis Communication Certification](https://blog.bcm-institute.org/crisis-communication/crisis-communication-certification)
    - [Crisis Management Certification](https://blog.bcm-institute.org/en/crisis-management/crisis-management-certification)
    - [IT Disaster Recovery Planning Certification](https://blog.bcm-institute.org/it-disaster-recovery/it-disaster-recovery-certification)
    - [Operational Resilience Certification](https://blog.bcm-institute.org/operational-resilience/operational-resilience-certification)
    - [Operational Resilience Audit Certification](https://blog.bcm-institute.org/operational-resilience-audit)
- [Seminars](https://blog.bcm-institute.org/meet-the-expert/mte-webinar-mainpage)
- [Store](https://www.bcm-institute.org/store-2/)
- [Contact Us](http://www.bcm-institute.org/about-us/contact-us/)

- <https://www.facebook.com/BCMInstitute/>
- <https://www.linkedin.com/company/business-continuity-management-institute-bcm-institute>

###### Building Operational Resilience at Bank Julius Baer: A Strategic Implementation Guide

![\[BB\] \[FSI\] Late-Night Corporate Strategy Meeting](https://blog.bcm-institute.org/hs-fs/hubfs/BB%20FSI_Bank/%5BBB%5D%20%5BFSI%5D%20Late-Night%20Corporate%20Strategy%20Meeting.png?width=1671&height=941&name=%5BBB%5D%20%5BFSI%5D%20Late-Night%20Corporate%20Strategy%20Meeting.png "[BB] [FSI] Late-Night Corporate Strategy Meeting")

# \[OR\] \[BJB\] \[E2\] \[C14\] Bank Julius Baer's Sustain Phase of the Operational Resilience Planning Methodology

[![\[OR\] \[BJB\] \[Full Banner\] Strengthening Banking Resilience A Practical Guide for Bank Julius Baer](https://no-cache.hubspot.com/cta/default/3893111/e929c6dc-a612-428f-b369-59f1b149ace1.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/e929c6dc-a612-428f-b369-59f1b149ace1)Once an operational resilience project has delivered its first results, attention naturally moves to the next priority. The Sustain phase exists to stop that drift.

It is the third phase of Bank Julius Baer's (BJB's) Operational Resilience Planning Methodology, and it turns a project into an ongoing programme that stays funded, visible and credible.

It has five stages: Introduce Cultural Change, Develop Communication Strategy, Implement Training and Awareness, Provide Self-assessment and Conduct Independent Quality Review.

As elsewhere in this eBook, the internal arrangements described are illustrative.

[![Sustain Phase](https://no-cache.hubspot.com/cta/default/3893111/cd40e631-43df-4dc6-85e8-3544d151d6d8.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/cd40e631-43df-4dc6-85e8-3544d151d6d8)[![\[Logo\] \[OR\] Certification Transparent](https://no-cache.hubspot.com/cta/default/3893111/09ce1ea0-4d44-4deb-867f-2e2b1b867768.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/09ce1ea0-4d44-4deb-867f-2e2b1b867768)

[Moh Heng Goh](https://blog.bcm-institute.org/or-v2/author/moh-heng-goh) Nov 19, 2026

## [![BJB Legal Disclaimer Banner](https://no-cache.hubspot.com/cta/default/3893111/76215f61-1d28-496b-9b19-d5146352e15d.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/76215f61-1d28-496b-9b19-d5146352e15d)[![Sustain Phase](https://no-cache.hubspot.com/cta/default/3893111/cd40e631-43df-4dc6-85e8-3544d151d6d8.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/cd40e631-43df-4dc6-85e8-3544d151d6d8)

## Introduction

[![\[OR\] \[BJB\] \[E2\] \[P3\] \[C14\] The Five Stages of the \_Sustain\_ Phase](https://no-cache.hubspot.com/cta/default/3893111/53ad46fa-2ebc-48b0-9ec6-5d5dd7b6d203.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/53ad46fa-2ebc-48b0-9ec6-5d5dd7b6d203)Once an operational resilience project has delivered its first results, attention naturally moves to the next priority. The Sustain phase exists to stop that drift. It is the third phase of Bank Julius Baer's (BJB's) Operational Resilience Planning Methodology, and it turns a project into an ongoing programme that stays funded, visible and credible. It has five stages: Introduce Cultural Change, Develop Communication Strategy, Implement Training and Awareness, Provide Self-assessment and Conduct Independent Quality Review. As elsewhere in this eBook, the internal arrangements described are illustrative.

## Purpose of the Chapter

This chapter gives you the overall picture of the Sustain phase before the stage chapters go into detail. You should be able to explain why sustaining resilience is a separate phase, what each stage contributes and how the five stages relate. The reader who is a senior manager should see what behaviour and reporting to expect. The OR lead should see the activities that keep the programme alive.

## Stage 1: Introduce Cultural Change

Culture is a strong force that separates organisations that are prepared for a crisis from those that are prone to one. Cultural change is a continuing effort by management and staff, not a memo. Leaders signal culture by what they do.

*Illustrative example:* BJB's senior managers ask the question "what does this change do to our critical services?" in product and change approvals, and recognise teams that raise resilience issues early.

## Stage 2: Develop Communication Strategy

A communication strategy sets out what the bank will say about resilience, to whom and through which channels, both in normal times and during a disruption. Internal communication keeps staff clear on their tasks. External communication protects reputation and keeps clients informed.

*Illustrative example:* BJB pre-approves holding statements for clients in the event of a payment delay, and agrees which relationship managers use which message.

## Stage 3: Implement Training and Awareness

Awareness directs attention to resilience concerns. Training builds skills for specific roles. The programme should start with awareness and reach all staff, because employees make up most of the organisation, and the hardest task is reaching them.

*Illustrative example:* all staff receive a short induction module, service owners complete a half-day course, and crisis team members take part in exercises.

## Stage 4: Provide Self-assessment

The self-assessment documents the resilience journey and how the bank meets regulatory requirements. The service owner is responsible for an annual report, which should be available to the regulator on request.

*Illustrative example:* each BJB service owner submits an annual self-assessment covering identification, mapping, tolerance, testing, governance, training and remediation.

## Stage 5: Conduct Independent Quality Review

An objective review by qualified reviewers validates the effectiveness of the programme. It uses the three lines model, with internal audit as the third line and external specialists as an additional source of assurance.

*Illustrative example:* an independent reviewer examines whether the tolerance for CBS-2 Client Payments and Cash Transfers is supported by evidence and whether scenarios are realistic.

## Why Sustaining Is Hard

Once the first critical services have been mapped and tested, the project team is often reassigned, the budget is reduced and executives turn to other priorities. At the same time, services change: new products are launched, suppliers are replaced, systems are upgraded and staff move on. Unless the programme has a rhythm of its own, the maps and tolerances will drift away from reality. The Sustain phase provides that rhythm through culture, communication, training, an annual self-assessment and a periodic independent review.

## An Annual Cycle for BJB

A simple annual calendar helps. In the first quarter, service owners review the inventory, maps and tolerances. In the second and third quarters, scenario tests and exercises are run, and training is delivered. In the fourth quarter, owners complete the self-assessment, the resilience forum reviews results, and the board receives the annual report. Every second or third year an independent review takes place. The calendar should be agreed at the start of the year and shared with all service owners.

## Measuring the Sustain Phase

- Share of critical services with current maps and tolerances reviewed in the last twelve months
- Number of scenario tests completed against plan
- Training completion and awareness survey results
- Number of remediation actions open and overdue
- Number of self-assessments submitted on time
- Status of independent review actions

These measures give the executive committee a quick view of whether the programme is being kept alive.

## Summary Table

| **Stage** | **Focus** | **Output** |
| --- | --- | --- |
| **1. Introduce Cultural Change** | **Behaviour and leadership** | **Aligned incentives and practices** |
| **2. Develop Communication Strategy** | **Internal and external messaging** | **Communication plan** |
| **3. Implement Training and Awareness** | **Skills and understanding** | **Training plan and records** |
| **4. Provide Self-assessment** | **Evidence of compliance** | **Annual report** |
| **5. Conduct Independent Quality Review** | **Objective validation** | **Review report and action plan** |

## [![\[Banner\] \[Summing\] \[OR\] \[E2\] \[C14\] Five Stages of the \_Sustain\_ Phase](https://no-cache.hubspot.com/cta/default/3893111/5667aa64-e221-49b1-b02b-b4a00910c56b.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/5667aa64-e221-49b1-b02b-b4a00910c56b)Conclusion

Sustain is about habits more than projects. When BJB staff think about critical services without being prompted, when clients receive timely messages and when the board sees credible evidence each year, the programme has become part of the way the bank runs. The next chapter starts with culture.

## Sources

- [Sustaining Your Operational Resilience Program](https://blog.bcm-institute.org/operational-resilience/sustaining-your-operational-resilience-program), BCM Institute

**Continue reading:** Chapter 15, *Introducing Cultural Change Management of OR Sustain Phase for Bank Julius Baer*, looks at how behaviour changes.

 

[![\[OR\] \[BJB\] \[34 Banner\] Strengthening Banking Resilience A Practical Guide for Bank Julius Baer](https://no-cache.hubspot.com/cta/default/3893111/00cdca0d-a0af-4bc5-972d-ee3caa7a94e4.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/00cdca0d-a0af-4bc5-972d-ee3caa7a94e4)

| **eBook 2: Implementing Operational Resilience for Bank Julius Baer** |  |  |  |
| --- | --- | --- | --- |
| **C1** | **C2** | **C8** | **C14** |
| [![\[OR\] \[BJB\] \[E2\] \[C1\] OR Planning Methodology](https://no-cache.hubspot.com/cta/default/3893111/3d6383a7-3d72-453d-a290-961ba27ab5c3.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/3d6383a7-3d72-453d-a290-961ba27ab5c3) | [![\[OR\] \[BJB\] \[E2\] \[P1\] \[S1-S5\] \[C2\] Five Stages of the \_Plan\_ Phase](https://no-cache.hubspot.com/cta/default/3893111/c8556221-4983-4862-ae1d-469687b348eb.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/c8556221-4983-4862-ae1d-469687b348eb) | [![\[OR\] \[BJB\] \[E2\] \[P2\] \[S1-S5\] \[C8\] Five Stages of the \_Implement\_ Phase](https://no-cache.hubspot.com/cta/default/3893111/5950274f-db27-46d5-93a8-728b5b0c071c.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/5950274f-db27-46d5-93a8-728b5b0c071c) | [![\[OR\] \[BJB\] \[E2\] \[P3\] \[C14\] The Five Stages of the \_Sustain\_ Phase](https://no-cache.hubspot.com/cta/default/3893111/53ad46fa-2ebc-48b0-9ec6-5d5dd7b6d203.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/53ad46fa-2ebc-48b0-9ec6-5d5dd7b6d203) |

 

|  | **"Sustain" Phase of the Operational Resilience Planning Methodology** |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- |
|  | **C14** | **C15** | **C16** | **C17** | **C18** | **C19** |
|  | [![\[OR\] \[BJB\] \[E2\] \[P3\] \[C14\] The Five Stages of the \_Sustain\_ Phase](https://no-cache.hubspot.com/cta/default/3893111/53ad46fa-2ebc-48b0-9ec6-5d5dd7b6d203.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/53ad46fa-2ebc-48b0-9ec6-5d5dd7b6d203) | [![\[OR\] \[BJB\] \[E2\] \[P3\] \[S1\] \[C15\] Introducing Cultural Change Management](https://no-cache.hubspot.com/cta/default/3893111/e295f1b8-7a10-4220-a6bd-26a3833cc74c.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/e295f1b8-7a10-4220-a6bd-26a3833cc74c) | [![\[OR\] \[BJB\] \[E2\] \[P3\] \[S2\] \[C16\] Developing a Communication Strategy](https://no-cache.hubspot.com/cta/default/3893111/8d6e7c50-304e-42c8-b122-63a9148bcdba.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/8d6e7c50-304e-42c8-b122-63a9148bcdba) | [![\[OR\] \[BJB\] \[E2\] \[P3\] \[S3\] C17\] Implementing Training and Awareness](https://no-cache.hubspot.com/cta/default/3893111/7b937ee3-fb5b-4506-b23a-5e744cf8dcf8.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/7b937ee3-fb5b-4506-b23a-5e744cf8dcf8) | [![\[OR\] \[BJB\] \[E2\] \[P3\] \[S4\] \[C18\] Providing Self-Assessment](https://no-cache.hubspot.com/cta/default/3893111/392b1906-ffc3-4d4f-840a-71f3d70f9a78.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/392b1906-ffc3-4d4f-840a-71f3d70f9a78) | [![\[OR\] \[BJB\] \[E2\] \[P3\] \[S5\] \[C19\] Conducting Independent Quality Reviews](https://no-cache.hubspot.com/cta/default/3893111/5011ef56-b909-4aa8-896a-ec9692d979f6.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/5011ef56-b909-4aa8-896a-ec9692d979f6) |

 

## **Comments**

![CTA Banner\_OR](https://blog.bcm-institute.org/hubfs/CTA%20Banner%20for%20Blog/CTA%20Banner_OR.jpg "CTA Banner_OR")

---

![CTA Banner\_ORA](https://blog.bcm-institute.org/hubfs/CTA%20Banner%20for%20Blog/CTA%20Banner_ORA.jpg "CTA Banner_ORA")

---

![CTA Banner\_BCM](https://blog.bcm-institute.org/hubfs/CTA%20Banner%20for%20Blog/CTA%20Banner_BCM.jpg "CTA Banner_BCM")

---

![CTA Banner\_ITDR](https://blog.bcm-institute.org/hubfs/CTA%20Banner%20for%20Blog/CTA%20Banner_ITDR.jpg "CTA Banner_ITDR")

---

![CTA Banner\_CM](https://blog.bcm-institute.org/hubfs/CTA%20Banner%20for%20Blog/CTA%20Banner_CM.jpg "CTA Banner_CM")

![BCMIWhiteLogoSmall.png](https://blog.bcm-institute.org/hs-fs/hubfs/Blog%20Testing/BCMIWhiteLogoSmall.png?width=72&name=BCMIWhiteLogoSmall.png "BCMIWhiteLogoSmall.png")

All rights reserved. Copyright 2026

```json
{
  "@context" : "https://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Moh Heng Goh",
    "url" : "https://blog.bcm-institute.org/or-v2/author/moh-heng-goh"
  },
  "dateModified" : "2026-11-19T03:36:58.630Z",
  "datePublished" : "2026-11-19T03:34:56.000Z",
  "headline" : "[OR] [BJB] [E2] [C14] Bank Julius Baer's Sustain Phase of the Operational Resilience Planning Methodology",
  "image" : [ "https://blog.bcm-institute.org/hubfs/BJB%20Graphic%20Folder/BJB%20Morepost/BJB%20E2%20Morepost/%5BOR%5D%20%5BBJB%5D%20%5BE2%5D%20%5BP3%5D%20%5BC14%5D%20The%20Five%20Stages%20of%20the%20_Sustain_%20Phase.jpg" ],
  "mainEntityOfPage" : {
    "@id" : "https://blog.bcm-institute.org/or-v2/or-bjb-e2-chapter-14-bank-julius-baers-sustain-phase-of-the-operational-resilience-planning-methodology",
    "@type" : "WebPage"
  },
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "url" : "https://blog.bcm-institute.org/hubfs/BCMI%20Logo.png"
    },
    "name" : "BCMI Pte Ltd"
  }
}
```