title: "[OR] [BJB] [E2] [C11] Establishing Impact Tolerance of OR Implement Phase for Bank Julius Baer"
description: How Bank Julius Baer can set impact tolerances for critical services in eight steps, and why they differ from recovery time objectives, with examples.
image: https://blog.bcm-institute.org/hubfs/BJB%20Graphic%20Folder/BJB%20Morepost/BJB%20E2%20Morepost/%5BOR%5D%20%5BBJB%5D%20%5BE2%5D%20%5BP2%5D%20%5BS2%5D%20%5BC11%5D%20Establishing%20Impact%20Tolerance.jpg
---

[![BCMIWhiteLogo.png](https://blog.bcm-institute.org/hs-fs/hubfs/Blog%20Testing/BCMIWhiteLogo.png?width=556&name=BCMIWhiteLogo.png "BCMIWhiteLogo.png")](http://www.bcm-institute.org/)

- [Home](https://www.bcm-institute.org/)
- [About Us](https://www.bcm-institute.org/about-us-3/) 
    - [A President’s Perspective](https://www.bcm-institute.org/about-us/a-presidents-perspective/)
    - [Our History](https://www.bcm-institute.org/about-us/our-history/)
    - [Our Advisory Council](https://www.bcm-institute.org/about-us/our-advisory-council/)
    - [Customers’ Testimonials](https://www.bcm-institute.org/about-us/customers-testimonials/)
    - [Credential Verification](https://www.bcm-institute.org/about-us/credential-verification/)
- [Courses](https://blog.bcm-institute.org/blog/course-fees-for-blended-learning-courses-master-catalog) 
    - [ISO 22301 Business Continuity Management System Audit](https://blog.bcm-institute.org/audit/business-continuity-management-audit-courses)
    - [ISO 22301 Business Continuity Management](https://blog.bcm-institute.org/bcm/business-continuity-management-courses)
    - [Crisis Communication](https://blog.bcm-institute.org/crisis-communication/crisis-communication-courses)
    - [Crisis Management](https://blog.bcm-institute.org/en/crisis-management/courses)
    - [IT Disaster Recovery](https://blog.bcm-institute.org/it-disaster-recovery/courses)
    - [Operational Resilience](https://blog.bcm-institute.org/operational-resilience/courses)
    - [Operational Resilience Audit](https://blog.bcm-institute.org/operational-resilience-audit/courses)
- [Certification](https://blog.bcm-institute.org/certification/types-of-certifications-offered) 
    - [ISO 22301 BCMS Audit Certification](https://blog.bcm-institute.org/certification/business-continuity-management-audit-certification)
    - [ISO22301 Business Continuity Management Certification](https://blog.bcm-institute.org/bcm/business-continuity-management-certification)
    - [Crisis Communication Certification](https://blog.bcm-institute.org/crisis-communication/crisis-communication-certification)
    - [Crisis Management Certification](https://blog.bcm-institute.org/en/crisis-management/crisis-management-certification)
    - [IT Disaster Recovery Planning Certification](https://blog.bcm-institute.org/it-disaster-recovery/it-disaster-recovery-certification)
    - [Operational Resilience Certification](https://blog.bcm-institute.org/operational-resilience/operational-resilience-certification)
    - [Operational Resilience Audit Certification](https://blog.bcm-institute.org/operational-resilience-audit)
- [Seminars](https://blog.bcm-institute.org/meet-the-expert/mte-webinar-mainpage)
- [Store](https://www.bcm-institute.org/store-2/)
- [Contact Us](http://www.bcm-institute.org/about-us/contact-us/)

- <https://www.facebook.com/BCMInstitute/>
- <https://www.linkedin.com/company/business-continuity-management-institute-bcm-institute>

###### Building Operational Resilience at Bank Julius Baer: A Strategic Implementation Guide

![\[BB\] \[FSI\] Industrial Generator and UPS Facility](https://blog.bcm-institute.org/hs-fs/hubfs/BB%20FSI_Bank/%5BBB%5D%20%5BFSI%5D%20Industrial%20Generator%20and%20UPS%20Facility.png?width=1670&height=941&name=%5BBB%5D%20%5BFSI%5D%20Industrial%20Generator%20and%20UPS%20Facility.png "[BB] [FSI] Industrial Generator and UPS Facility")

# \[OR\] \[BJB\] \[E2\] \[C11\] Establishing Impact Tolerance of OR Implement Phase for Bank Julius Baer

[![\[OR\] \[BJB\] \[Full Banner\] Strengthening Banking Resilience A Practical Guide for Bank Julius Baer](https://no-cache.hubspot.com/cta/default/3893111/e929c6dc-a612-428f-b369-59f1b149ace1.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/e929c6dc-a612-428f-b369-59f1b149ace1)An impact tolerance is the maximum level of disruption that Bank Julius Baer (BJB) will accept for a critical business service.

It marks the point beyond which harm to clients, to the bank or to the market becomes intolerable. It is outcome-based and answers how much, when and for how long.

It is not the same as a recovery time objective in business continuity planning, which is a time target for a system or process. It also does not depend on how likely a disruption is.

It assumes that the disruption has happened.

[![Impact Tolerance](https://no-cache.hubspot.com/cta/default/3893111/00e8044a-8a62-4f8f-be7c-9c267d8b3dfc.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/00e8044a-8a62-4f8f-be7c-9c267d8b3dfc)[![\[Logo\] \[OR\] Certification Transparent](https://no-cache.hubspot.com/cta/default/3893111/09ce1ea0-4d44-4deb-867f-2e2b1b867768.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/09ce1ea0-4d44-4deb-867f-2e2b1b867768)

[Moh Heng Goh](https://blog.bcm-institute.org/or-v2/author/moh-heng-goh) Nov 19, 2026

## [![BJB Legal Disclaimer Banner](https://no-cache.hubspot.com/cta/default/3893111/76215f61-1d28-496b-9b19-d5146352e15d.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/76215f61-1d28-496b-9b19-d5146352e15d)[![Impact Tolerance](https://no-cache.hubspot.com/cta/default/3893111/00e8044a-8a62-4f8f-be7c-9c267d8b3dfc.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/00e8044a-8a62-4f8f-be7c-9c267d8b3dfc)

## Introduction

[![\[OR\] \[BJB\] \[E2\] \[P2\] \[S2\] \[C11\] Establishing Impact Tolerance](https://no-cache.hubspot.com/cta/default/3893111/764c0954-f189-402d-9267-4569b1f8d47a.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/764c0954-f189-402d-9267-4569b1f8d47a)An impact tolerance is the maximum level of disruption that Bank Julius Baer (BJB) will accept for a critical business service. It marks the point beyond which harm to clients, to the bank or to the market becomes intolerable. It is outcome-based and answers how much, when and for how long. It is not the same as a recovery time objective in business continuity planning, which is a time target for a system or process. It also does not depend on how likely a disruption is. It assumes that the disruption has happened.

## Purpose of the Chapter

This chapter explains how to set tolerances for each service in eight steps. By the end you should be able to define impact types, justify a tolerance threshold, link tolerances to risk appetite and document them in a way that the Monetary Authority of Singapore (MAS) and the board can follow. The figures in the examples are illustrative.

## Key Terms

Levels of harm run from inconvenience to harm to intolerable harm. The impact tolerance threshold is the justification for the level chosen. The maximum tolerable level of disruption is the point at which the viability of the institution would be harmed irreversibly if services were not restored. Impact types include time, data loss, financial loss, client numbers and market effects.

## Implementation Steps

### Steps 1 and 2: Identify Impact Types and Set a Tolerance for Each

Choose the measures that describe harm for each service.

*Illustrative example:* for CBS-2 Client Payments and Cash Transfers, the impact types are the delay in releasing payments, the value of payments delayed and the number of clients affected.

### Step 3: Link Tolerances to Risk Appetite and Risk Scales

The tolerance must sit within the appetite approved by the board. If a tolerance is looser than the appetite, one of them needs to change.

### Step 4: Set Tolerances for Each Critical Business Service

*Illustrative example:* CBS-2 tolerance: instructions accepted before the daily cut-off must be released on the same business day, and no more than a stated percentage of clients can be affected for more than one day. CBS-4 Custody and Safekeeping of Client Assets: client holdings must be visible and accurate within the same business day after an outage.

### Step 5: Define Levels with Stakeholders

Agree the levels with service owners, risk, compliance and technology, considering maximum downtime, data loss, financial loss and client effect.

### Step 6: Account for Regulatory and Compliance Requirements

Include legal obligations and supervisory expectations, for example relevant MAS requirements on business continuity and outsourcing **\[verify\]**.

### Step 7: Document

Record the agreed levels, the rationale and the evidence as a reference for resilience strategies and response plans.

### Step 8: Review and Update

Review at least annually and after significant change.

## Tolerance Versus Recovery Objective

A technology recovery objective of four hours does not mean the tolerance is four hours. The service may need several systems, people and third parties to be recovered together. The tolerance describes what the client experiences. Where the combined recovery time exceeds the tolerance, the difference is a vulnerability that goes into the remediation plan.

## Justifying the Threshold

A tolerance is only as good as its reasoning. For each service, the owner should write a short paragraph explaining why disruption beyond the stated level would cause intolerable harm. The paragraph should cover who would be affected, how, and whether harm increases sharply at some point such as a market close or a settlement deadline. It should refer to past incidents, client feedback, complaint data and any regulatory expectations. A supervisor or reviewer reading the paragraph should be able to see that the level was chosen deliberately and not copied from a recovery time objective.

## Handling Several Impact Types

A service often has more than one measure. CBS-2 might have a tolerance for the delay in releasing payments, another for the number of clients affected and a third for data accuracy after recovery. Treat them together: the service is within tolerance only if all of them are met. Record the measures in a standard table with the owner, the data source and the frequency with which each is measured.

## When the Tolerance Cannot Be Met

Sometimes the mapping and testing show that the bank cannot meet the tolerance today. This is not a reason to loosen the tolerance. It is a vulnerability to be recorded, reported to the board and remediated. The bank may choose interim measures, such as manual workarounds or increased monitoring, and set a date by which the tolerance will be met. If the bank concludes that the tolerance itself was too strict, the change should be approved by the same body that approved the original, with the reasoning recorded.

## Review Triggers

Review tolerances at least annually, and after a significant change in the service, the client base, the supplier, the technology or the regulatory environment. Review them after any real incident and after any test that raises doubts about the original reasoning.

## Summary Table

| **Service** | **Illustrative impact measure** | **Illustrative tolerance** |
| --- | --- | --- |
| **CBS-2 Client Payments and Cash Transfers** | **Delay in release of cut-off payments** | **Same business day** |
| **CBS-3 Securities Trading and Settlement** | **Missed settlement deadlines** | **No missed deadlines beyond one cycle** |
| **CBS-4 Custody and Safekeeping of Client Assets** | **Visibility of holdings** | **Restored within the same business day** |

These values are placeholders for discussion, not statements of BJB's actual tolerances.

## [![\[Banner\] \[Summing\] \[OR\] \[E2\] \[C11\] Establishing Impact Tolerance](https://no-cache.hubspot.com/cta/default/3893111/c3c2c124-99cc-4c2e-a57a-45d6274f20e7.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/c3c2c124-99cc-4c2e-a57a-45d6274f20e7)Conclusion

Tolerances give BJB a test to pass. They turn a vague aim to be resilient into a measurable standard that can be tested in scenarios and reported to the board. The next chapter shows how to test against them.

## Sources

- [What is Setting Impact Tolerance in Operational Resilience?](https://blog.bcm-institute.org/operational-resilience/or-p2-s3-what-is-impact-tolerance-in-operational-resilience), BCM Institute

**Continue reading:** Chapter 12, *Performing Scenario Testing of OR Implement Phase for Bank Julius Baer*, tests whether the bank stays within tolerance.

 

[![\[OR\] \[BJB\] \[34 Banner\] Strengthening Banking Resilience A Practical Guide for Bank Julius Baer](https://no-cache.hubspot.com/cta/default/3893111/00cdca0d-a0af-4bc5-972d-ee3caa7a94e4.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/00cdca0d-a0af-4bc5-972d-ee3caa7a94e4)

| **eBook 2: Implementing Operational Resilience for Bank Julius Baer** |  |  |  |
| --- | --- | --- | --- |
| **C1** | **C2** | **C8** | **C14** |
| [![\[OR\] \[BJB\] \[E2\] \[C1\] OR Planning Methodology](https://no-cache.hubspot.com/cta/default/3893111/3d6383a7-3d72-453d-a290-961ba27ab5c3.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/3d6383a7-3d72-453d-a290-961ba27ab5c3) | [![\[OR\] \[BJB\] \[E2\] \[P1\] \[S1-S5\] \[C2\] Five Stages of the \_Plan\_ Phase](https://no-cache.hubspot.com/cta/default/3893111/c8556221-4983-4862-ae1d-469687b348eb.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/c8556221-4983-4862-ae1d-469687b348eb) | [![\[OR\] \[BJB\] \[E2\] \[P2\] \[S1-S5\] \[C8\] Five Stages of the \_Implement\_ Phase](https://no-cache.hubspot.com/cta/default/3893111/5950274f-db27-46d5-93a8-728b5b0c071c.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/5950274f-db27-46d5-93a8-728b5b0c071c) | [![\[OR\] \[BJB\] \[E2\] \[P3\] \[C14\] The Five Stages of the \_Sustain\_ Phase](https://no-cache.hubspot.com/cta/default/3893111/53ad46fa-2ebc-48b0-9ec6-5d5dd7b6d203.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/53ad46fa-2ebc-48b0-9ec6-5d5dd7b6d203) |

 

|  | **"Implement" Phase of the Operational Resilience Planning Methodology** |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- |
|  | **C8** | **C9** | **C10** | **C11** | **C12** | **C13** |
|  | [![\[OR\] \[BJB\] \[E2\] \[P2\] \[S1-S5\] \[C8\] Five Stages of the \_Implement\_ Phase](https://no-cache.hubspot.com/cta/default/3893111/5950274f-db27-46d5-93a8-728b5b0c071c.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/5950274f-db27-46d5-93a8-728b5b0c071c) | [![\[OR\] \[BJB\] \[E2\] \[P2\] \[S1\] \[C9\] Identifying Critical Business Services](https://no-cache.hubspot.com/cta/default/3893111/b99da948-a447-4a5b-a7a0-cc79c15a5c34.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/b99da948-a447-4a5b-a7a0-cc79c15a5c34) | [![\[OR\] \[BJB\] \[E2\] \[P2\] \[S2\] \[C10\] Mapping Interconnections and Interdependencies](https://no-cache.hubspot.com/cta/default/3893111/37ba6226-41b9-4103-8c91-d0cf1c59378f.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/37ba6226-41b9-4103-8c91-d0cf1c59378f) | [![\[OR\] \[BJB\] \[E2\] \[P2\] \[S2\] \[C11\] Establishing Impact Tolerance](https://no-cache.hubspot.com/cta/default/3893111/764c0954-f189-402d-9267-4569b1f8d47a.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/764c0954-f189-402d-9267-4569b1f8d47a) | [![\[OR\] \[BJB\] \[E2\] \[P2\] \[S4\] \[C12\] Performing Scenario Testing](https://no-cache.hubspot.com/cta/default/3893111/cc7273b6-ff28-44e2-bf3e-541e397942b3.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/cc7273b6-ff28-44e2-bf3e-541e397942b3) | [![\[OR\] \[BJB\] \[E2\] \[P2\] \[S5\] \[C13\] Improving Lessons Learned](https://no-cache.hubspot.com/cta/default/3893111/2f88c30e-9bb9-4f09-a9fe-3a228915ad60.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/2f88c30e-9bb9-4f09-a9fe-3a228915ad60) |

## **Comments**

![CTA Banner\_OR](https://blog.bcm-institute.org/hubfs/CTA%20Banner%20for%20Blog/CTA%20Banner_OR.jpg "CTA Banner_OR")

---

![CTA Banner\_ORA](https://blog.bcm-institute.org/hubfs/CTA%20Banner%20for%20Blog/CTA%20Banner_ORA.jpg "CTA Banner_ORA")

---

![CTA Banner\_BCM](https://blog.bcm-institute.org/hubfs/CTA%20Banner%20for%20Blog/CTA%20Banner_BCM.jpg "CTA Banner_BCM")

---

![CTA Banner\_ITDR](https://blog.bcm-institute.org/hubfs/CTA%20Banner%20for%20Blog/CTA%20Banner_ITDR.jpg "CTA Banner_ITDR")

---

![CTA Banner\_CM](https://blog.bcm-institute.org/hubfs/CTA%20Banner%20for%20Blog/CTA%20Banner_CM.jpg "CTA Banner_CM")

![BCMIWhiteLogoSmall.png](https://blog.bcm-institute.org/hs-fs/hubfs/Blog%20Testing/BCMIWhiteLogoSmall.png?width=72&name=BCMIWhiteLogoSmall.png "BCMIWhiteLogoSmall.png")

All rights reserved. Copyright 2026

```json
{
  "@context" : "https://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Moh Heng Goh",
    "url" : "https://blog.bcm-institute.org/or-v2/author/moh-heng-goh"
  },
  "dateModified" : "2026-11-19T03:20:26.794Z",
  "datePublished" : "2026-11-19T03:19:58.000Z",
  "headline" : "[OR] [BJB] [E2] [C11] Establishing Impact Tolerance of OR Implement Phase for Bank Julius Baer",
  "image" : [ "https://blog.bcm-institute.org/hubfs/BJB%20Graphic%20Folder/BJB%20Morepost/BJB%20E2%20Morepost/%5BOR%5D%20%5BBJB%5D%20%5BE2%5D%20%5BP2%5D%20%5BS2%5D%20%5BC11%5D%20Establishing%20Impact%20Tolerance.jpg" ],
  "mainEntityOfPage" : {
    "@id" : "https://blog.bcm-institute.org/or-v2/or-bjb-e2-chapter-11-establishing-impact-tolerance-of-or-implement-phase-for-bank-julius-baer",
    "@type" : "WebPage"
  },
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "url" : "https://blog.bcm-institute.org/hubfs/BCMI%20Logo.png"
    },
    "name" : "BCMI Pte Ltd"
  }
}
```