---
title: "[CM] [JHA] [E3] [CORE] [C1] Starting Your CM Implementation for Jamiyah Home for the Aged"
description: "Start crisis management at Jamiyah Home for the Aged: how eBook 3 uses completed CRA and CMS templates to prepare a 24-hour eldercare home for crises."
---

[CM v2](https://blog.bcm-institute.org/cm-v2)

# [\[CM\] \[JHA\] \[E3\] \[CORE\] \[C1\] Starting Your CM Implementation for Jamiyah Home for the Aged](https://blog.bcm-institute.org/cm-v2/cm-jha-e3-core-chapter-1-starting-your-cm-implementation-for-jamiyah-home-for-the-aged)

 Written by [Moh Heng Goh](https://blog.bcm-institute.org/cm-v2/author/moh-heng-goh) | Nov 24, 2026, 1:38:11 PM

 **eBook 3 \[CORE\]: Chapter 1**

**Starting Your CM Implementation for Jamiyah Home for the Aged**

## Introduction

This is eBook 3 in the Crisis Management in Action series*: A Practical Implementation Guide for Jamiyah Home for the Aged*.

It follows Jamiyah Home for the Aged (JHA) as it prepares or updates its crisis management (CM) implementation. JHA runs an eldercare home at 1 Tampines Ave 3, Singapore, and the home operates 24 hours a day.

When something goes wrong in a home like this, the people affected are older, frail and cannot easily protect themselves, so good preparation matters more than usual.

The eBook is a working record of the first deliverables of a CM project: a set of completed templates that list the threats JHA faces, rate the risks, and set out how the home will prevent and respond to a crisis. Each chapter that follows contains one template, filled in with content that fits the home.

*Every rating, control, strategy, and time target in this chapter is a proposed draft built from public information about JHA and must be validated by JHA before use.*

## About JHA

JHA's public website (https://jha.jamiyah.org.sg/) gives a short but clear picture. The home is called Darul Takrim, and it provides shelter and care for elderly, frail and destitute residents. It started at Still Road on 15 December 1996 and moved to its present site on 17 December 1997.

The then Ministry of Community Development set it up, with the Muslim Missionary Society Singapore appointed as Managing Agent.

The home operates around the clock; the office is open from 9 am to 6 pm, and visitors must write to the Superintendent before they visit.

The site also names other Jamiyah homes, including Darul Islah (a halfway house) and Darul Syifaa' (a nursing home), as well as community services.

It does not state how many residents the home cares for, how many staff it has, whether it holds charity or Institution of a Public Character status, or which regulators oversee it. Where this eBook needs those facts, it says that they are assumed and must be confirmed by JHA.

## Why This eBook is Provided

This eBook is part of a value-added service called Training-led Implementation.

It is offered to organisations that intend to start a CM project or upgrade an existing CM programme through the Business Continuity Management (BCM) Institute's certification or competency-based training courses.

The idea is simple. People learn the method in the course, then apply it straight away to their own organisation. The chapters are therefore completed templates with real content, written for the organisation that attends the course, rather than empty forms.

The content is a compilation of submissions that an organisation prepares during a crisis management exercise. That means the tables should be read as a first full draft. They give the crisis management team something concrete to challenge, correct and improve, which is far faster than starting from a blank page.

## Pre-reading: eBook 1 and eBook 2

The content here builds on two earlier eBooks in the series, which serve as pre-reading and guidance.

eBook 1 helps the reader understand the organisation, and eBook 2 explains how to implement the foundations.

Readers who have not yet read them should do so first, because the threats, scenarios and strategies in this eBook make sense only when the purpose, services, people and dependencies of the home are already clear.

## Where this eBook Sits in the CM Planning Methodology

The planning methodology used by the BCM Institute moves through several phases. This eBook drills down into two of them. Phase 2 is the Crisis Scenario Risk Assessment (CRA), which asks what could go wrong, how bad it would be and how likely it is.

Phase 4 is the Crisis Management Strategy (CMS), which decides how the organisation will prevent a crisis and how it will respond if one happens anyway.

Seven templates make up those two phases. Table 1.1 lists them and shows the chapter in which each one appears.

Chapter 3 is included because the series needs a list of crisis scenarios between the list of threats and the list of technology threats.

**Table 1.1: The seven CRA and CMS templates and the chapters that hold them**

| **Template code** | **Template** | **Chapter** |
| --- | --- | --- |
| **CRA 1-1** | **List of Threats** | **2** |
| **CRA 1-2** | **List of Crisis Scenarios** | **3** |
| **CRA 1-3** | **List of Technology Threats** | **4** |
| **CRA 2-1** | **Treatment and Control** | **5** |
| **CRA 2-2** | **Risk Impact and Likelihood Assessment** | **6** |
| **CMS 3-1** | **Crisis Prevention Strategy** | **7** |
| **CMS 3-2** | **Crisis Response Strategy** | **8** |

## How the Chapters Fit Together

The chapters follow the methodology. Each one feeds the next, so a change in one table usually means a change in another.

1. **Chapter 2 – List of Threats.** Lists 22 threats under five crisis types, from floods to ransomware.
2. **Chapter 3 – List of Crisis Scenarios.** Picks 6 high-risk scenarios that the crisis management team will plan for first.
3. **Chapter 4 – List of Technology Threats.** Examines the 9 technology and equipment threats that affect resident safety.
4. **Chapter 5 – Treatment and Control.** Shows how each threat is avoided, reduced, transferred or accepted, and what controls exist or are planned.
5. **Chapter 6 – Risk Impact and Likelihood Assessment.** Scores the impact in seven areas and the likelihood, and rates each risk.
6. **Chapter 7 – Crisis Prevention Strategy.** Sets out how the home will stop crises in nine crisis categories.
7. **Chapter 8 – Crisis Response Strategy.** Sets out how the home will respond if a crisis happens.

## Governance and Standards Context

Several frameworks shape how JHA should read this eBook.

The primary governance authority is the Commissioner of Charities, Singapore, and the home is expected to follow the Code of Governance for Charities and IPCs (2023).

For business continuity, the reference standard is International Organisation for Standardisation (ISO) 22301:2019 with Amendment 1:2024, supported by the guidance in ISO 22313:2020.

These standards focus on continuity of operations, while crisis management covers the leadership, communication, and decisions surrounding a major event. The two work best when planned together.

The sector regulators named for JHA are the Ministry of Social and Family Development (MSF), the Ministry of Health (MOH) and the Early Childhood Development Agency.

Two points are worth stating. First, the [Social Residential Homes Act (SRHA)](https://www.msf.gov.sg/what-we-do/srha/about-srha) was enacted in April 2025 and came into operation on 1 July 2026, replacing the Homes for the Aged Act.

The licence class that applies to JHA should be confirmed against the Act. Second, infectious disease control in Singapore is led by the Communicable Diseases Agency (CDA) and MOH, and the [Infectious Diseases Act](https://www.cda.gov.sg/public/infectious-diseases-act/) sets the notification rules.

The relevance of the Early Childhood Development Agency to an eldercare home is to be confirmed.

## How to Use the Tables in this eBook

Treat each table as a starting point and follow four simple steps.

1. Read the entries with the crisis management team and remove anything that does not apply to the home.
2. Add facts that only the home knows, such as the number of residents, the layout of the building and the contracts in place.
3. Give each action a named owner and a date.
4. Review the whole set at least once a year, and after every incident or exercise.

Entries marked "to be confirmed" are ones where the public record does not give the answer. They need an honest check, not a guess.

Starting a CM implementation is mostly about making the first decisions visible.

This eBook gives JHA seven completed templates showing what a threat list, a risk rating, a treatment plan, and a pair of strategies could look like for a 24-hour eldercare home.

The next chapter begins with the list of threats, the foundation on which everything else rests.

 

 

| **eBook 3: Starting Your Crisis Management Implementation** |  |  |  |
| --- | --- | --- | --- |
| **\[E3\] \[C1\]** | **\[CRA\] \[1-1\]** | **\[CRA\] \[1-2\]** | **\[CRA\] \[1-3\]** |
|  |  |  |  |
| **\[CRA\] \[2-1\]** | **\[CRA\] \[2-2\]** | **\[CMS\] \[3-1\]** | **\[CMS\] \[P3-2\]** |
|  |  |  |  |
|  |  |  |  |

 

More Information About Crisis Management Blended/ Hybrid Learning Courses

To learn more about the course and schedule, click the buttons below for CM-300 Crisis Management Implementer \[CM-3\] and CM-5000 Crisis Management Expert Implementer \[CM-5\].

|  |  |  |
| --- | --- | --- |
|  |  |  |
|  | Please feel free to send us a note if you have any questions. |  |
|  |  |  |

 

 

 

[View full post](https://blog.bcm-institute.org/cm-v2/cm-jha-e3-core-chapter-1-starting-your-cm-implementation-for-jamiyah-home-for-the-aged)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Moh Heng Goh"
  },
  "dateModified" : "2026-11-24T14:30:11.613Z",
  "datePublished" : "2026-11-24T13:38:11Z",
  "headline" : "[CM] [JHA] [E3] [CORE] [C1] Starting Your CM Implementation for Jamiyah Home for the Aged",
  "image" : {
    "@type" : "ImageObject",
    "height" : 60,
    "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
    "width" : 60
  },
  "mainEntityOfPage" : "https://blog.bcm-institute.org/cm-v2/cm-jha-e3-core-chapter-1-starting-your-cm-implementation-for-jamiyah-home-for-the-aged",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60,
      "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
      "width" : 60
    },
    "name" : "CM v2"
  }
}
```