This design profile is a checklist to ensure that all aspects have been considered in planning a Walk-through Test. In this Walk-through Test, recovery team members meet to verbally walk-through the specific steps of each component of the business continuity process according to the completed plan.
Definition
|
|
Objective |
Confirm the feasibility of the business unit’s recovery procedures without invoking recovery resources |
Scope and Scale (Active/ Passive; degree of involvement) |
Passive |
Components to be tested |
|
Plans |
Yes |
People |
Yes |
Place |
No |
Resources |
No |
Success Criteria |
There should be NO disagreement between Controller and business unit coordinators |
Essential Pre-Conditions |
Both Business Unit Coordinator and his/her Business Unit Heads must have agreed on the plan |
Participants |
- |
Internal |
Yes |
External |
Yes |
Scheduling
|
|
Time of Test/Schedule |
At a pre-arranged time during office hours |
Duration |
Maximum 2 Hours (any areas not covered must be dealt with at another meeting) |
Frequency (mandatory/desirable) |
Once a year (mandatory); after each review (desirable) |
Notice Requirement/Warning |
Yes |
Briefing of Participants |
Yes - short email introduction in advance of the test to define basic objectives and conduct |
Scenario |
Not Required |
Test of plan |
No |
Budget for test |
No |
Execution/ Monitoring
|
|
Controllers |
One controller, external to the business unit. Possibly business unit coordinators of another business unit or members of the corporate BCP Team |
Document
|
|
Documentation (capable of audit) -Track events and degree of success |
Record results. and Note issues arising |
Review/ Measure |
|
Post-Mortem Meeting |
Meeting not immediately required. Consider a number of Walk-through Tests at a regular meeting |
Report/ Output
|
|
Post-Test Actions (documented) –link to maintenance/reporting |
Record the outcome on “Records of Exceptions Noted During Test” and document remedial actions required (with responsibilities and target dates) |
Maintenance/ Follow-Up
|
|
Make amendments to plan as required |
If appropriate, amend the plan(s). Arrange re-tests where necessary |
Goh, M. H. (2006). Testing and Exercising Your Business Continuity Plan. Business Continuity Management Series (2nd ed.). Singapore: GMH Pte Ltd.
Extracted from "Chapter 25: T3: Design Profile for Walk-through Test"
To know more about our blended learning program and when the next course is scheduled, feel free to contact our friendly course consultant colleagues via sales.ap@bcm-institute.org. They are the BL-B-3 Blended Learning BCM-300 ISO22301 BCMS Implementer and the BL-B-5 Blended Learning BCM-5000 ISO22301 BCMS Expert Implementer.