---
title: "[BCM] [EGH] [E3] [PD] CBF [1] Emergency Department Services"
description: "EGH recovery procedure for CBF-1 emergency department services: preparedness, the first 24 hours and restoration, with roles and times, under ISO 22301."
---

[BCM v2](https://blog.bcm-institute.org/bcm-v2)

# [\[BCM\] \[EGH\] \[E3\] \[PD\] CBF \[1\] Emergency Department Services](https://blog.bcm-institute.org/bcm-v2/chapter-10-business-continuity-recovery-procedure-for-cbf-1)

 Written by [Moh Heng Goh](https://blog.bcm-institute.org/bcm-v2/author/moh-heng-goh) | Nov 18, 2026, 9:30:14 AM

## Introduction

Chapters 2 to 10 analysed Critical Business Function 1 (CBF-1), Emergency Department Services, at Eastern General Hospital (EGH) one step at a time. This chapter brings the analysis together in a recovery procedure: a practical, chronological guide that tells people what to do before a disruption, in the first 24 hours, and after the first day until normal service returns.

A Business Continuity Recovery Procedure supports the Business Continuity Plan (BCP) by turning strategies into actions that named people can follow under pressure. It is part of the wider business continuity management (BCM) programme and follows four ideas that ISO 22301, ISO 22313 and the crisis management guidance of ISO 22361 describe: preparedness, response, recovery and restoration. Preparedness happens before an incident. Response limits harm in the first minutes. Recovery brings the 12 Sub-Critical Business Functions (Sub-CBFs) back to their minimum level. Restoration returns the department to normal and learns from the event.

Roles must be assigned before an incident because nobody can negotiate responsibility in the first ten minutes. The procedure therefore names roles, not people, and the hospital should attach names, deputies and contact numbers when it opens. All times, numbers and arrangements are illustrative and must be validated by EGH. Guidance is written in line with Singapore good practice for business continuity management, described in general terms.

### How to use this procedure

Print the procedure and keep it in the department, the command centre and the hospital incident office, because a procedure stored only on a failed system is of no use. Parts 3 and 4 are written so that a deputy who has never led a recovery can follow them. Each step names a role, a time and an output, and each can be checked off.

Three principles guide judgement where the procedure does not give an answer. Patient safety comes before speed and before cost. Decisions are recorded, even when made in haste, so that they can be reviewed later. And information is shared early, because a rumour spreads faster than a statement.

## Guidance Notes for Implementing CBF-1 Emergency Department Services

**Description.** CBF-1 Emergency Department Services receives, assesses, treats, observes and disposes of every person who needs urgent care at EGH, around the clock. It is made up of the 12 Sub-CBFs defined in Chapter 2.

**Business purpose.** The function protects life and health at the point of greatest urgency, and it is the main route by which acutely ill patients enter the hospital. Major operational outcomes are timely triage, safe treatment, accurate records and smooth transfer to wards, theatres, critical care or the community.

**Why it is critical.** Delay can mean death or permanent harm, demand cannot be scheduled, and failure is immediately visible to patients, families and the public. It also depends on almost every other function in the hospital.

**Stakeholders and obligations.** The stakeholders are patients and families, clinical and support staff, ambulance services, partner institutions in the SingHealth group, the Ministry of Health (MOH) and the public. The function operates under the Healthcare Services Act 2020 (HCSA) and its regulations, described here in general terms. The hospital should confirm notification duties with its legal advisers \[verify\].

## Part 2: Pre-Crisis Preparedness for CBF-1 Emergency Department Services

### Reduce Phase: Objective

Preparedness reduces the likelihood and the effect of a disruption. Its purpose is to make sure that, when an incident occurs, people, places, systems and information are ready, and that every Sub-CBF can reach its minimum objective inside its recovery time objective (RTO).

### Reduce Phase: How

1. **Governance:** the emergency department clinical lead owns CBF-1 and reports on readiness to the board at least once a year. Each Sub-CBF has a named owner and a deputy.
2. **Recovery team responsibilities:** the department recovery lead activates the plan, the nurse in charge runs the floor, the clinical lead decides on clinical priorities, and a scribe records decisions. The Crisis Management Team (CMT) of the hospital supports them.
3. **Succession planning:** each role has two deputies, and a printed call-in list shows who takes over if the first person cannot be reached.
4. **Training and awareness:** all staff learn the downtime procedures during induction. Cross-training covers triage, medication checks and temporary identity creation (CBF-1.2, CBF-1.6 and CBF-1.11).
5. **Resource readiness:** minimum resources in Chapter 10 are stocked and checked. This includes downtime kits, identity bands, emergency drugs, protective equipment and portable monitors.
6. **Alternate workplace arrangements:** alternate treatment and observation areas are designated, and their layouts and equipment lists are kept in the command centre (CBF-1.4, CBF-1.7 and CBF-1.8).
7. **Digital systems preparedness:** read-only downtime views and offline access to allergy and medication data are tested. Registration and the medical record are monitored by the digital team.
8. **Disaster recovery readiness:** system recovery times and recovery points in Chapter 6 are tested at least annually, and the results are shared with the clinical lead.
9. **Supplier preparedness:** the ambulance service, diagnostic services, pharmacy and logistics teams agree notice periods and alternative routes, as mapped in Chapter 7.
10. **Communication readiness:** messages for patients, families, staff and the media are drafted in advance, and a second communication channel is available if the main network fails.
11. **Emergency contact lists:** printed and electronic lists are updated every month and held in the department, the command centre and with the CMT.
12. **Document management:** procedures, forms and floor plans are version-controlled and printed copies are kept in the department.
13. **Vital records:** the records in Chapter 8 are backed up, and paper copies of key forms are stored in a separate location.
14. **Dependency verification:** every quarter, the department confirms that each dependency in Chapter 7 still works and that contacts are current.
15. **Testing and exercising:** the plan is exercised at least twice a year, once as a discussion and once as a practical drill, with at least one drill held on a night shift.
16. **Preventive controls:** equipment maintenance, infection screening at the entrance, safe staffing rules and checks of emergency power are carried out to lower the likelihood of disruption.
17. **Readiness checklists:** a one-page checklist is completed at the start of each shift covering staffing, equipment, stocks, systems and contacts.

Readiness is reviewed against the 12 Sub-CBFs. If any Sub-CBF has no owner, no deputy, no downtime kit or no exercise in the last year, it is marked as not ready and reported to the clinical lead.

### Response, Recovery and Resume Phase: Objective

The first 24 hours aim to protect people, stabilise the department and restore the Sub-CBFs, in order of urgency, to their minimum business continuity objectives (MBCOs). T+0 is the moment the disruption is recognised.

### Response, Recovery and Resume Phase: How

Activities follow in time order. Times are indicative.

1. **T+0 to T+15 minutes, notification and safety:** the first person to notice the disruption informs the nurse in charge, who confirms it and calls the clinical lead. Staff check on patient safety first, protect those on life support and move anyone in danger.
2. **T+0 to T+15 minutes, activation:** the clinical lead or nurse in charge decides whether to activate the Business Continuity Plan, and informs the hospital command. If the disruption affects other functions or lasts beyond an hour, the Crisis Management Team is activated.
3. **T+15 minutes to T+1 hour, assessment:** a safety assessment checks power, gases, fire and security. A damage assessment lists which spaces, systems and equipment are usable. The scribe starts a decision log, which is kept throughout.
4. **T+15 minutes to T+1 hour, first restoration:** the Sub-CBFs with the shortest RTOs, resuscitation and triage, are secured first. Manual workarounds begin at once for registration, orders and recording.
5. **T+1 hour to T+4 hours, resource mobilisation:** staff are called in using the printed list, extra stock is drawn, and alternate areas are opened if needed. The roster coordinator redeploys staff by priority.
6. **T+1 hour to T+4 hours, communication:** patients and families in the department are told what is happening, and the media and communications team issues the first public statement if needed. Staff are briefed every hour.
7. **T+1 hour to T+4 hours, digital system recovery:** the digital team starts system recovery in the order of the system RTOs in Chapter 6. The department receives a time estimate and plans for downtime accordingly.
8. **T+4 hours to T+12 hours, regulatory and partner notification:** the hospital informs MOH and other required parties if the event meets reporting rules \[verify\]. The patient flow team contacts partner institutions and the ambulance service about diversion or support.
9. **T+4 hours to T+12 hours, supplier coordination:** pharmacy, diagnostics, logistics and facilities confirm their status and recovery times. Gaps are escalated to the Crisis Management Team.
10. **T+12 hours to T+24 hours, stabilise and report:** the recovery lead reviews progress against MBCOs every four hours, adjusts priorities and reports to the command centre. Staff rest is planned so that fatigue does not become the next problem.
11. **Throughout, decisions and documentation:** decisions about clinical priorities belong to the clinical lead, about resources to the recovery lead, and about public communication to the Crisis Management Team. Every action is logged with the time and the person responsible.

### Restoration order

When resources are limited, Sub-CBFs are restored in order of RTO, as shown below. Those with the same RTO are restored in code order.

**Table 12: Business Continuity Recovery Procedure for CBF-1 Emergency Department Services**

| **Priority** | **Sub-CBF Code** | **Sub-Critical Business Function** | **Recovery Time Objective (RTO)** | **Maximum Tolerable Period of Disruption (MTPD)** |
| --- | --- | --- | --- | --- |
| **1** | **CBF-1.3** | **Resuscitation and Life-Saving Intervention** | **5 minutes** | **1 hour** |
| **2** | **CBF-1.2** | **Triage and Registration** | **15 minutes** | **4 hours** |
| **3** | **CBF-1.1** | **Ambulance Arrival and Pre-hospital Handover** | **30 minutes** | **8 hours** |
| **4** | **CBF-1.4** | **Emergency Assessment and Treatment** | **1 hour** | **8 hours** |
| **5** | **CBF-1.6** | **Emergency Medication Administration** | **1 hour** | **8 hours** |
| **6** | **CBF-1.10** | **Surge and Mass Casualty Response** | **2 hours** | **1 day** |
| **7** | **CBF-1.12** | **Emergency Staff Deployment and Shift Handover** | **2 hours** | **1 day** |
| **8** | **CBF-1.5** | **Emergency Diagnostic Requesting and Results Review** | **2 hours** | **1 day** |
| **9** | **CBF-1.11** | **Patient Identification and Clinical Documentation** | **4 hours** | **2 days** |
| **10** | **CBF-1.7** | **Infection Screening and Isolation** | **4 hours** | **3 days** |
| **11** | **CBF-1.8** | **Emergency Observation and Short-Stay Care** | **4 hours** | **2 days** |
| **12** | **CBF-1.9** | **Patient Disposition, Transfer and Family Communication** | **8 hours** | **3 days** |

Times are illustrative and taken from Chapter 5.

Manual workarounds apply to every Sub-CBF whose system is down: paper triage forms, paper medication charts, runner services for tests, a manual bed list, written handover and downtime identity bands. Each manual record is marked, kept together and reconciled later.

### Scenario triggers to rehearse

The same steps apply to different events, but the early priorities differ. The following triggers should be rehearsed at least once each in the first two years of operation.

- **Loss of the electronic record or network:** activate paper downtime for triage, orders, medication and handover (CBF-1.2, CBF-1.5, CBF-1.6 and CBF-1.11).
- **Loss of power, gases or air handling in part of the department:** move patients to alternate areas and protect monitoring and the resuscitation bay (CBF-1.3, CBF-1.4 and CBF-1.8).
- **Staff shortage from illness or transport disruption:** call in staff, redeploy by priority and relax deferrable work (CBF-1.12).
- **Outbreak or infectious patient surge:** activate isolation and cohort areas, extend screening and declare surge if needed (CBF-1.7 and CBF-1.10).
- **Mass casualty event:** declare surge, change the triage method and open surge areas (CBF-1.1, CBF-1.2 and CBF-1.10).

### Restore and Return Phase: Objective

After the first day the aim is to return the department to normal safely, to close the gaps created by workarounds, and to learn from the event. Restoration should not be rushed, because a hurried return can cause errors as serious as the original disruption.

### Restore and Return Phase: How

1. **Restoration of full services:** the recovery lead agrees with the clinical lead which Sub-CBFs can return to full service, in the order of risk, and records the date and time of each.
2. **Return to the primary workplace:** alternate areas are closed only after the primary areas are checked for safety, cleaned, restocked and signed off. Patients are moved with a nurse, and records move with them.
3. **Return from the alternate site:** equipment borrowed for the alternate areas is returned to its owners, cleaned, and checked for faults.
4. **Reconciliation of manual work:** clerks and nurses enter paper records into the system within 24 hours of restoration, and each entry is checked against the paper original by a second person.
5. **Validation of data integrity:** the digital team runs checks for duplicate or missing records, and the medical records unit merges temporary identities with permanent ones.
6. **Restoration of digital services:** systems return in controlled steps, with each tested by users before the paper process stops.
7. **Restoration of records:** vital records restored from backup are compared with the paper copies, and any gap is reported to the clinical lead.
8. **Reinstatement of normal staffing:** overtime is reduced, call-in staff are thanked and given rest, and any staff affected by the event are offered support.
9. **Supplier normalisation:** temporary arrangements with partners and suppliers are ended in writing, and any costs are recorded.
10. **Financial reconciliation:** finance records extra costs, lost income and any insurance claims, using the formulas in Chapter 4 as a guide.
11. **Patient and stakeholder communication:** families, partner institutions, MOH and the public are told that normal service has returned and are given a contact point for questions.
12. **Regulatory reporting:** any final report required by MOH is prepared by the clinical lead and reviewed by legal advisers \[verify\].
13. **Operational performance monitoring:** waiting times, left-without-treatment rates, incident reports and staff sickness are watched for at least 30 days for signs of lasting effects.
14. **Lessons learned and post-incident review:** within two weeks, a facilitated review asks what happened, what worked, what did not and why. All staff, including night staff, are invited.
15. **Corrective actions:** each lesson becomes an action with an owner and a date. The BCM coordinator tracks them until they are closed.
16. **Updates, training and continual improvement:** the Business Continuity Plan, the MBCOs, the RTOs and the exercise schedule are updated, training is improved, and the board is told what changed.

This procedure supports the Business Continuity Plan by turning the analysis of Chapters 2 to 10 into steps that people can follow in order. Preparation before a disruption determines how much can be done after it: the hospital that has trained, stocked and exercised will recover faster than one that tries to improvise.

Disciplined execution matters in the first 24 hours, when pressure is greatest. Clear roles, a decision log and a restoration order stop effort being spent on the wrong things. Continual improvement matters afterwards, because each incident and each exercise shows where the plan was thin.

The procedure is not finished when it is written. After each exercise, each real incident and each major change to the department, the owners of Parts 2 to 4 should ask three questions: was the step clear, was it done in time, and did it protect the patient? The answers feed the next version, so that the document records what the hospital has learned and not only what it first planned.

Documented procedures strengthen the resilience of EGH because they make recovery repeatable, testable and auditable. Successful recovery depends on preparation, coordination, communication and continual improvement.

**Continue reading:** explore BCM Institute's ISO 22301 courses and certifications at [blog.bcm-institute.org/certification](https://blog.bcm-institute.org/certification), and look out for the next Critical Business Function guide in the series *Keeping Care Running: Managing and Implementing Business Continuity Management at Eastern General Hospital*.

 

 

| **eBook 3: Starting Your BCM Implementation** |  |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- | --- |
| **MBCO** | **P&S** | **RAR T1** | **RAR T2** | **RAR T3** | **BCS T1** | **CBF** |
|  |  |  |  |  |  |  |
| **CBF-1 Emergency Department Services** |  |  |  |  |  |  |
| **DP** | **BIAQ P1** | **BIAQ P2** | **BIAQ P3** | **BIAQ P4** | **BIAQ P5** | **BIAQ P6** |
|  |  |  |  |  |  |  |
|  |  | **BCS T2** | **BCS T3** | **PD** |  |  |
|  |  |  |  |  |  |  |

[View full post](https://blog.bcm-institute.org/bcm-v2/chapter-10-business-continuity-recovery-procedure-for-cbf-1)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Moh Heng Goh"
  },
  "dateModified" : "2026-11-18T09:30:59.338Z",
  "datePublished" : "2026-11-18T09:30:14Z",
  "headline" : "[BCM] [EGH] [E3] [PD] CBF [1] Emergency Department Services",
  "image" : {
    "@type" : "ImageObject",
    "height" : 60,
    "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
    "width" : 60
  },
  "mainEntityOfPage" : "https://blog.bcm-institute.org/bcm-v2/chapter-10-business-continuity-recovery-procedure-for-cbf-1",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60,
      "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
      "width" : 60
    },
    "name" : "BCM v2"
  }
}
```