description: SAESL minimum staff, seats, devices and equipment to run recovery for 12 engine MRO Sub-CBFs in CBF-1 at their MBCO, in line with ISO 22301 and ISO 22313.
---

[BCM v2](https://blog.bcm-institute.org/bcm-v2)

# [\[BCM\] \[SAESL\] \[E3\] \[CBF\] \[1\] Chapter 9: Minimum Resources Required during a Disaster for CBF-1](https://blog.bcm-institute.org/bcm-v2/bcm-saesl-e3-cbf-1-chapter-9-minimum-resources-required-during-a-disaster-for-cbf-1)

 Written by [Dr Goh Moh Heng](https://blog.bcm-institute.org/bcm-v2/author/dr-goh-moh-heng) | Nov 17, 2026, 3:39:55 AM

**\[BCM\] \[SAESL\] \[E3\] \[CBF\] \[1\] Chapter 9: Minimum Resources Required during a Disaster for CBF-1**

## Introduction

A recovery strategy is only as good as the resources behind it. A planner with the offline schedule but no seat, a technician with an alternate build area but no calibrated tools, or a signatory with a token but no laptop cannot deliver the recovery that Chapter 8 describes. This chapter sets the minimum people, workplace, technology, communications and equipment each Sub-Critical Business Function (Sub-CBF) of CBF-1 needs at Singapore Aero Engine Services Private Limited (SAESL).

Resource planning is a core part of business continuity planning (BCP). The business impact analysis (BIA) says what must continue and how fast. The recovery strategies say how. The resource requirements say what each strategy needs to run. Together they make a plan that can be activated without improvisation. Each line is written so that a facilities manager can prepare the space and a purchasing lead can price the equipment.

Only the minimum is identified, because the aim is to reach the business unit minimum business continuity objective (MBCO) from chapter 2, not to reproduce normal operations. During a disruption, people, space and equipment are scarce. Allocating a full shift to every process would starve the processes that matter most. Optimising limited resources means giving each Sub-CBF enough to meet its objective and no more.

All quantities are illustrative planning assumptions for SAESL to validate. They assume shared seats and devices where practical, and they do not include any third-party staff. Seats and devices are shared where roles work in the shop rather than at a desk, so they are lower than staff numbers.

## Minimum Resources Table

**Table 9: Minimum Resources Required during a Disaster for CBF-1 Engine Maintenance, Repair and Overhaul (MRO) Operations**

| **Sub-CBF Code** | **Sub-Critical Business Function** | **Recovery Location** | **Minimum Resource Requirements per Function per Recovery Location** | **Number of Staff (Minimum)** | **Number of Seats (Minimum)** | **Number of Telephones (Minimum)** | **Number of PCs/Laptops (Minimum)** | **Other Resources (Description and Minimum Quantity)** |
| --- | --- | --- | --- | --- | --- | --- | --- | --- |
| CBF-1.1 | **Engine Induction and Work Scope Agreement** | **Primary Site (unaffected areas)** | **Induction supervisor, one inspector and one clerk, working from the induction area with the paper pack** | **3** | **2** | **2** | **1** | **1 paper induction pack (50 forms); 1 barcode scanner; 1 calibrated measuring kit** |
| CBF-1.2 | **Production Planning and Turnaround Control** | **Primary Site; remote working** | **Planning manager and two cross-trained planners, with the offline schedule and secure remote access** | **3** | **2** | **3** | **3** | **1 printer; virtual private network (VPN) access for 3 users; 1 printed copy of the schedule per shift** |
| CBF-1.3 | **Engine Disassembly and Module Strip** | **Alternate Shop-floor Area on Site** | **One supervisor and five technicians per shift, with lifting equipment and controlled tag books** | **6** | **1** | **1** | **1** | **1 gantry or lifting rig; 1 engine stand; 2 tag books; 1 set of tools; 1 uninterruptible power supply (UPS) unit** |
| CBF-1.4 | **Part Inspection and Non-Destructive Testing** | **Primary Site** | **Two authorised inspectors, one non-destructive testing operator and one supervisor** | **4** | **2** | **2** | **2** | **1 set of spare calibrated instruments; 1 non-destructive testing station; 50 numbered paper forms; 1 quarantine cage** |
| CBF-1.5 | **Component Repair and Special Processes** | **Approved provider facility (to be confirmed)** | **SAESL liaison engineer, quality representative and two handlers to move parts and documents** | **4** | **2** | **2** | **2** | **2 controlled transport containers; 1 shipping document set; 1 approvals file with customer consent record** |
| CBF-1.6 | **Materials and Life-Limited Part Management** | **Primary Site stores** | **Two storekeepers and one buyer, with traceability records** | **3** | **2** | **2** | **2** | **2 barcode or radio-frequency identification (RFID) scanners; 1 bonded quarantine cage; critical consumables for 7 days (indicative) of priority builds** |
| CBF-1.7 | **Engine Build and Module Assembly** | **Alternate Shop-floor Area on Site** | **One supervisor, four technicians and one inspector for the second-person check** | **6** | **1** | **1** | **1** | **1 build stand; 2 sets of calibrated torque tools (1 spare); 20 paper job cards** |
| CBF-1.8 | **Engine Test Cell Operations** | **Primary Site; partner test facility (to be confirmed)** | **One operator, one test engineer and a two-person safety crew, plus a data analyst** | **5** | **3** | **3** | **3** | **2 redundant data loggers; 1 spare calibrated sensor set; 1 UPS unit; 1 secure data link** |
| CBF-1.9 | **Final Inspection, Certification and Release to Service** | **Primary Site; remote working** | **Two authorised signatories and one records reviewer** | **3** | **3** | **2** | **3** | **3 authentication tokens; 2 digital signature devices; 1 offline list of authorisations; 1 secure printer** |
| CBF-1.10 | **Engine Preservation and Shipment** | **Primary Site (preserved storage)** | **Two handlers and one shipping clerk** | **3** | **1** | **2** | **1** | **Preservation consumables for 2 engines (indicative); 1 label printer; 1 list of pre-qualified carriers** |
| CBF-1.11 | **Technical Records and Airworthiness Documentation** | **Disaster Recovery Site; Primary Site for paper** | **Two information and communications technology (ICT) staff and two records staff, working from the disaster recovery site and the records office** | **4** | **4** | **4** | **4** | **2 high-speed scanners; 1 secure link to the recovery site; 100 numbered paper job cards; backup media** |
| CBF-1.12 | **Customer Status Reporting and Engineering Support** | **Remote working; Primary Site** | **Two customer support staff and two engineers, working remotely with secure access** | **4** | **4** | **4** | **4** | **VPN access for 4 users; 1 video conferencing facility; 1 status email template; 4 mobile phones** |
| **Total** | **All 12 Sub-CBFs** | **Various** | **Illustrative maximum if every Sub-CBF recovers at the same time** | **48** | **27** | **28** | **27** | **Not totalled** |

All quantities are illustrative minimums for SAESL to validate. Staff counts are per shift. Third-party staff are not included. Where a Sub-CBF lists two locations, the quantities apply to the first, and the second needs the same minimum if the first is unavailable.

## Conclusion

Identifying minimum recovery resources supports business continuity planning by turning strategies into a shopping list and a staffing plan. The illustrative total of 48 people is a small fraction of the over 1,000 skilled people SAESL reports. It shows that recovery at the minimum level depends less on the number of people than on having the right ones: authorised signatories, qualified inspectors and cross-trained planners. Exercises should test the figures directly: ask a team to run its recovery with only the listed resources and note what is missing.

Three points stand out.

- **Largest teams:** strip and build need six people each per shift, because gantry and lifting work cannot be done safely with fewer.
- **Scarce authorisations:** release (CBF-1.9) and the test cell (CBF-1.8) depend on authorised people, so cross-training and a current list of authorisations matter more than headcount.
- **Remote working:** planning, release review, and customer support can run from home or another site, reducing the seats needed on the main site.

Resource optimisation is essential in a disruption because everything is scarce at once. The MBCO from chapter 2 sets the target, the recovery strategy from chapter 8 chooses the route, and the recovery location decides where the resources must be. Change one and the others move. If a strategy changes, the resource lines must change with it.

Documented minimum resources help SAESL prepare for, respond to and recover from disruption. They show what to stock, what to cross-train and what to place on standby. SAESL should check each line against actual stock, such as spare instruments and tokens, and record any shortfall as an action. They also help SAESL show, in line with ISO 22301, ISO 22313, and Singapore business continuity good practice, that its plans rest on existing resources.

**Continue reading:** Chapter 10, *Business Continuity Recovery Procedure for CBF-1*, turns the strategies and resources into a step-by-step procedure for before, during and after a disruption.

[View full post](https://blog.bcm-institute.org/bcm-v2/bcm-saesl-e3-cbf-1-chapter-9-minimum-resources-required-during-a-disaster-for-cbf-1)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Dr Goh Moh Heng"
  },
  "dateModified" : "2026-11-17T03:39:55.166Z",
  "datePublished" : "2026-11-17T03:39:55Z",
  "headline" : "[BCM] [SAESL] [E3] [CBF] [1] Chapter 9: Minimum Resources Required during a Disaster for CBF-1",
  "image" : {
    "@type" : "ImageObject",
    "height" : 60,
    "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
    "width" : 60
  },
  "mainEntityOfPage" : "https://blog.bcm-institute.org/bcm-v2/bcm-saesl-e3-cbf-1-chapter-9-minimum-resources-required-during-a-disaster-for-cbf-1",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60,
      "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
      "width" : 60
    },
    "name" : "BCM v2"
  }
}
```