title: "[BCM] [JHA] [E1] [C11] Summary of Understanding Your Organisation for Jamiyah Home for the Aged"
description: "A summary of eBook 1 for JHA: key outputs of all ten chapters, how they fit together, a readiness checklist and a preview of ISO 22301 implementation."
---

.

[![BCMIWhiteLogo.png](https://blog.bcm-institute.org/hs-fs/hubfs/Blog%20Testing/BCMIWhiteLogo.png?width=556&name=BCMIWhiteLogo.png "BCMIWhiteLogo.png")](http://www.bcm-institute.org/)

- [Home](https://www.bcm-institute.org/)
- [About Us](https://www.bcm-institute.org/about-us-3/) 
    - [A President’s Perspective](https://www.bcm-institute.org/about-us/a-presidents-perspective/)
    - [Our History](https://www.bcm-institute.org/about-us/our-history/)
    - [Our Advisory Council](https://www.bcm-institute.org/about-us/our-advisory-council/)
    - [Customers’ Testimonials](https://www.bcm-institute.org/about-us/customers-testimonials/)
    - [Credential Verification](https://www.bcm-institute.org/about-us/credential-verification/)
- [Courses](https://blog.bcm-institute.org/blog/course-fees-for-blended-learning-courses-master-catalog) 
    - [ISO 22301 Business Continuity Management System Audit](https://blog.bcm-institute.org/audit/business-continuity-management-audit-courses)
    - [ISO 22301 Business Continuity Management](https://blog.bcm-institute.org/bcm/business-continuity-management-courses)
    - [Crisis Communication](https://blog.bcm-institute.org/crisis-communication/crisis-communication-courses)
    - [Crisis Management](https://blog.bcm-institute.org/en/crisis-management/courses)
    - [IT Disaster Recovery](https://blog.bcm-institute.org/it-disaster-recovery/courses)
    - [Operational Resilience](https://blog.bcm-institute.org/operational-resilience/courses)
    - [Operational Resilience Audit](https://blog.bcm-institute.org/operational-resilience-audit/courses)
- [Certification](https://blog.bcm-institute.org/certification/types-of-certifications-offered) 
    - [ISO 22301 BCMS Audit Certification](https://blog.bcm-institute.org/certification/business-continuity-management-audit-certification)
    - [ISO22301 Business Continuity Management Certification](https://blog.bcm-institute.org/bcm/business-continuity-management-certification)
    - [Crisis Communication Certification](https://blog.bcm-institute.org/crisis-communication/crisis-communication-certification)
    - [Crisis Management Certification](https://blog.bcm-institute.org/en/crisis-management/crisis-management-certification)
    - [IT Disaster Recovery Planning Certification](https://blog.bcm-institute.org/it-disaster-recovery/it-disaster-recovery-certification)
    - [Operational Resilience Certification](https://blog.bcm-institute.org/operational-resilience/operational-resilience-certification)
    - [Operational Resilience Audit Certification](https://blog.bcm-institute.org/operational-resilience-audit)
- [Seminars](https://blog.bcm-institute.org/meet-the-expert/mte-webinar-mainpage)
- [Store](https://www.bcm-institute.org/store-2/)
- [Contact Us](http://www.bcm-institute.org/about-us/contact-us/)

- <https://www.facebook.com/BCMInstitute/>
- <https://www.linkedin.com/company/business-continuity-management-institute-bcm-institute>

###### Sustaining Community Services: Implementing BCM at Jamiyah Home for the Aged

![BB Nursing Compassionate Care Conversation](https://blog.bcm-institute.org/hs-fs/hubfs/BB%20BCM%20%5BAi%20Gen%20Blog%20Photo%5D/BB%20BCM%20Special%20Needs%20Care%20SPC/BB%20Nursing%20Compassionate%20Care%20Conversation.png?width=1536&height=1024&name=BB%20Nursing%20Compassionate%20Care%20Conversation.png "BB Nursing Compassionate Care Conversation")

# \[BCM\] \[JHA\] \[E1\] \[C11\] Summary of Understanding Your Organisation for Jamiyah Home for the Aged

[![New call-to-action](https://no-cache.hubspot.com/cta/default/3893111/1ce18ee1-97ef-4ed4-b16b-5d6ab24cec19.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/1ce18ee1-97ef-4ed4-b16b-5d6ab24cec19)

Jamiyah Home for the Aged (JHA) has now worked through the ten chapters of eBook 1. Together, they give the home a clear picture of what it does, what it wants its continuity programme to achieve, who will lead it, what threatens it and which services matter most. This chapter draws those threads together before the practical work of implementation begins.

eBook 1 is the first of three in the series *Implementing BCM at Jamiyah Home for the Aged (JHA)*. Its purpose is understanding, not action. That order is deliberate. Clause 4 of ISO 22301 requires an organisation to understand its context, the needs of its interested parties and the scope of its business continuity management system (BCMS) before it plans and operates that system. Strategies built without that understanding tend to protect the wrong things, or protect the right things in the wrong way.

This matters particularly for JHA. The home cares for elderly, frail and destitute residents around the clock, from a single site, and operates within a regulatory framework that changed significantly on 1 July 2026 when the Ministry of Social and Family Development (MSF) brought social residential homes under a new licensing regime. Residents cannot easily adapt to disruption, and MSF, as the admitting authority, expects homes to protect them. A sound understanding of the organisation is therefore the foundation of credible continuity planning.

The chapter is also designed as a standalone briefing. Board members who have not read every chapter can use it to understand what has been done and what decisions lie ahead. The Superintendent and the business continuity management (BCM) coordinator can use the readiness checklist to confirm that the foundations are complete. Department heads can use the summaries to see how their own services, risks and responsibilities fit into the wider picture, and to prepare for the business impact analysis (BIA) workshops that open eBook 2.

This chapter summarises Chapters 1 to 10, shows how they fit together, lists their key outputs, offers a readiness checklist for eBook 2, and closes with the main lessons and a look ahead.

[![New call-to-action](https://no-cache.hubspot.com/cta/default/3893111/d9e168e3-ac3e-49f1-96f8-fdf9b11bf195.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/d9e168e3-ac3e-49f1-96f8-fdf9b11bf195)

[Moh Heng Goh](https://blog.bcm-institute.org/bcm-v2/author/moh-heng-goh) Nov 3, 2026

*[![New call-to-action](https://no-cache.hubspot.com/cta/default/3893111/1ce18ee1-97ef-4ed4-b16b-5d6ab24cec19.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/1ce18ee1-97ef-4ed4-b16b-5d6ab24cec19)*

*[![New call-to-action](https://no-cache.hubspot.com/cta/default/3893111/d9e168e3-ac3e-49f1-96f8-fdf9b11bf195.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/d9e168e3-ac3e-49f1-96f8-fdf9b11bf195)*

*Implementing BCM at Jamiyah Home for the Aged (JHA) — eBook 1: Understanding Your Organisation for Jamiyah Home for the Aged*

## Introduction

[![\[BCM\] \[JHA\] \[E1\] \[C11\] Summary](https://no-cache.hubspot.com/cta/default/3893111/31ab625c-d574-40c6-bbb1-84dba0f6f5c9.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/31ab625c-d574-40c6-bbb1-84dba0f6f5c9)Jamiyah Home for the Aged (JHA) has now worked through the ten chapters of eBook 1. Together they give the home a clear picture of what it does, what it wants its continuity programme to achieve, who will lead it, what threatens it and which services matter most. This chapter draws those threads together before the practical work of implementation begins.

eBook 1 is the first of three in the series *Implementing BCM at Jamiyah Home for the Aged (JHA)*. Its purpose is understanding, not action. That order is deliberate. Clause 4 of ISO 22301 requires an organisation to understand its context, the needs of its interested parties and the scope of its business continuity management system (BCMS) before it plans and operates that system. Strategies built without that understanding tend to protect the wrong things, or protect the right things in the wrong way.

This matters particularly for JHA. The home cares for elderly, frail and destitute residents around the clock, from a single site, and operates within a regulatory framework that changed significantly on 1 July 2026 when the Ministry of Social and Family Development (MSF) brought social residential homes under a new licensing regime. Residents cannot easily adapt to disruption, and MSF, as the admitting authority, expects homes to protect them. A sound understanding of the organisation is therefore the foundation of credible continuity planning.

The chapter is also designed as a standalone briefing. Board members who have not read every chapter can use it to understand what has been done and what decisions lie ahead. The Superintendent and the business continuity management (BCM) coordinator can use the readiness checklist to confirm that the foundations are complete. Department heads can use the summaries to see how their own services, risks and responsibilities fit into the wider picture, and to prepare for the business impact analysis (BIA) workshops that open eBook 2.

This chapter summarises Chapters 1 to 10, shows how they fit together, lists their key outputs, offers a readiness checklist for eBook 2, and closes with the main lessons and a look ahead.

## Chapter-by-Chapter Summary

### Overview of Business Continuity Management for Jamiyah Home for the Aged

Chapter 1 introduced BCM as the process of identifying what JHA must keep doing during a disruption, how quickly each activity must resume and what resources are needed. It distinguished BCM from emergency response: a fire drill moves residents to safety, while BCM determines where they sleep, eat and receive medication afterwards. The chapter reflects clause 5.1 of ISO 22301 on leadership and commitment. It also explains that ISO 22301 and its guidance standard, ISO 22313, are voluntary and sit alongside JHA's legal obligations as a welfare home rather than replacing them.

Its key output is a shared understanding of BCM and the endorsement of JHA's leaders. Table 1 mapped each topic of eBook 1 to a key question and a main output. For example, the chapter explained why the board and the Superintendent need confidence that the home can keep caring for residents if the lift fails or the kitchen floods. It also introduced JHA's existing recovery tiers, which later chapters build on, and argued that BCM replaces improvisation with rehearsed decisions that protect residents and staff alike.

### Understanding Your Organisation for Jamiyah Home for the Aged

Chapter 2 built JHA's operational profile under clause 4.1. It covered the home's mission, its history since 1996, its status as an MSF-gazetted welfare home with MSF as the admitting authority, its 24-hour services and programmes, its people, its single site in Tampines, and its dependencies on utilities, suppliers, and external medical care. Where the home's website was silent, such as on staff numbers, information systems and suppliers, the chapter treated details as illustrative and flagged them for the BIA.

The output is an operational profile, summarised in Table 2, that links each home feature to a continuity implication. For example, because JHA operates from one site, any serious damage to the premises affects every service, which makes relocation a central question for eBook 2. The chapter also highlighted the faith-based context, under which halal meals and religious practice must continue during a disruption. It also identified residents, MSF, Jamiyah Singapore, families, partner agencies, volunteers and the wider community as the main interested parties.

### Establishing Organisational Goals for BCM for Jamiyah Home for the Aged

Chapter 3 proposed six BCM goals (G1 to G6) and a draft business continuity (BC) policy under clause 5.2. It noted that Singapore has no single national BCM policy for welfare homes and drew instead on MSF's regulatory framework, the Code of Governance for Charities and IPCs (2023) \[verify\] and ISO 22301. It also recommended testing the draft goals with leaders and front-line staff, and warned against goals that describe documents rather than outcomes.

The goals place resident safety and dignity (G1) and continuity of essential care (G2) first, followed by compliance, staff welfare, trust and communication, and learning and resilience. For example, in a prolonged power failure on a hot afternoon, G1 directs staff to check first on residents most at risk from heat, while G5 prompts early calls to families of residents who may need to move. The draft policy commits JHA to an ISO 22301-aligned BCMS, names the Superintendent as accountable and sets an annual review, subject to endorsement by Jamiyah Singapore's board.

### Establishing BCM Objectives for Jamiyah Home for the Aged

Chapter 4 turned the goals into eight measurable objectives (O1 to O8) under clause 6.2. It explained the SMART test, the need to plan resources, owners, deadlines and measures for each objective, and the importance of tracking both activity and outcome. It also linked objectives to resources under clause 7.1, noting that management time is JHA's main resource and that some objectives carry costs the board must approve.

The output is a set of objectives with suggested owners, targets and measures, grouped into foundations, capability and assurance, all illustrative. For example, O2 calls for a BIA of all 17 critical services, and O5 for a relocation arrangement with a receiving facility able to provide halal meals and space for prayer, with MSF informed. O7 commits the home to at least two exercises a year and O8 to twice-yearly reporting to the board, which together keep the programme visible and tested.

### Determining BCM Assumptions for Jamiyah Home for the Aged

Chapter 5 explained why planning assumptions must be written down, tested and approved, linking them to clause 6.1 and to the analyses in clause 8.2. It warned against assuming that incidents happen in office hours, that only one thing goes wrong at a time, or that external help will arrive quickly. It also proposed explicit assumptions about faith and daily routine, such as continuous halal meals and shifted meal times during Ramadan.

The output is an assumptions register, A1 to A7, covering staff absence, premises, utilities, suppliers, external medical services, relocation support and residents' need for assistance. For example, assumptions A1 and A7 together show why staffing is often JHA's binding constraint: if many staff are absent and most residents need help to move, an evacuation that is routine on a normal day becomes difficult. The chapter recommended testing assumptions against data, with partners and in exercises, and keeping them in a register reviewed at least annually.

### Composing BCM Team for Jamiyah Home for the Aged

Chapter 6 proposed a three-layer BCM structure under clauses 5.3, 7.2 and 7.3. Governance rests with Jamiyah Singapore's board and a steering committee chaired by the Superintendent; coordination rests with a BCM coordinator and departmental representatives; and response rests with an incident team, departmental recovery teams,  and shift leaders. The structure mirrors JHA's four departments, so people do, in a crisis, broadly what they do every day.

The outputs are an organisation chart, a responsibility table, terms of reference for the steering committee and simple escalation triggers. For example, a night shift leader who finds the water supply has failed starts the contingency and calls the duty manager straight away, without waiting for the morning. Every key role should have a trained deputy, because the person who normally holds a role may be the one affected by the disruption.

### Analysing Operating Environment for Jamiyah Home for the Aged

Chapter 7 examined JHA's external context and interested parties under clauses 4.1 and 4.2, and the climate change considerations added by Amendment 1:2024. It covered the new licensing regime and Code of Practice, a recent case of regulatory action against a nursing home, lessons from COVID-19 in long-term care, rising heat and rainfall, transboundary haze, technology outages, and the role of community and faith. Each factor was linked to a specific implication for the home's continuity planning.

The outputs are a context register and an interested parties register, summarised in Table 7. For example, the flash floods along Tampines Avenue 10 in August 2021 showed that JHA's main risk is not building flooding, but staff, suppliers, and transport being unable to reach the home. Similarly, the COVID-19 experience of visit suspensions and split zones suggested that JHA should plan how it would zone its premises and keep families in contact by video.

### Implementing the BCM Planning Methodology for Jamiyah Home for the Aged

Chapter 8 set out the BCMS scope and the seven-phase methodology used in this series, linked to clauses 4.3, 4.4 and 8.1: project management, risk analysis and review, BIA, business continuity strategy, plan development, testing and exercising, and programme management. It stressed that the phases overlap and repeat, and that the methodology fails if testing and programme management are treated as optional.

The outputs are a scope statement, covering all services at the Tampines premises, a list of the documents each phase produces and an illustrative roadmap linked to objectives O1 to O8. For example, a BIA workshop that reveals dependence on a single dialysis transport provider would send that finding back to the risk register and forward to the strategy phase. The chapter also recommended simple document control, so that a shift leader can always find the current version of a plan, including on paper.

### Assessing Risks and Threats for Jamiyah Home for the Aged

Chapter 9 explained how JHA should identify, analyse, evaluate and treat risks of disruption under clause 8.2.3, and distinguished these from risks to the BCMS itself under clause 6.1. It set out an eight-step method, sample likelihood and impact scales, a threat landscape tailored to a welfare home, a threat-identification checklist and guidance on reporting to the board. It examined MSF's framework, public health guidance, data protection and charity governance as the expectations that shape the home's risk criteria.

The output is an illustrative risk register of 12 risks (R1 to R12), with a matching risk matrix. An infectious disease outbreak (R1) and a sustained staff shortage (R9) were rated highest. The worked example showed how zoning, protective equipment, surge staff and virtual family access could reduce R1 from very high to high. The chapter also showed that several risks share the same underlying vulnerabilities, so that a few treatments can reduce many risks at once.

### Identifying Critical Business Functions for Jamiyah Home for the Aged

Chapter 10 examined the 17 critical services in JHA's continuity framework, coded CBF-1 to CBF-17, across Operations, Programme and Therapy, Social Work and Support. It explained the link between critical business functions and ISO 22301's prioritised activities under clause 8.2.2, and placed the services in the context of MSF requirements, charity governance, and voluntary standards. It also showed how faith and culture shape service delivery, such as meals and engagement.

The output is a preliminary list of prioritised services, each with dependencies, impacts and a recovery tier from Tier 1 (0–4 hours) to Tier 4 (one week), to be confirmed by the BIA with maximum tolerable periods of disruption and minimum business continuity objectives. For example, the worked example showed how CBF-13 Provision of meals could be kept within its Tier 1 recovery time through ready-meal stocks and a standby halal caterer. The chapter identified staff, the premises, utilities, transport and key external relationships as shared dependencies that support many services at once.

## How the Chapters Fit Together

The ten chapters follow a logical progression in six stages:

1. **Understand (Chapters 1–2):** learn what BCM is and what JHA does.
2. **Set direction (Chapters 3–5):** agree goals, objectives and planning assumptions.
3. **Organise (Chapter 6):** put the people and authority in place.
4. **Frame (Chapters 7–8):** understand the environment and agree the method and scope.
5. **Analyse (Chapters 9–10):** assess risks and identify critical services.
6. **Implement (eBook 2):** choose strategies, write plans and exercise them.

Each output feeds the next. The operational profile in Chapter 2 defines what the goals in Chapter 3 must protect. The goals shape the objectives in Chapter 4, and the assumptions in Chapter 5 set the conditions the plans must withstand. Chapter 6 identifies the work owners, while Chapters 7 and 8 define the context and methodology, including boundaries and sequence. The risk register and critical services list in Chapters 9 and 10 then become the evidence base for the strategies in eBook 2.

Risk assessment and BIA complement each other. The BIA asks what happens if a service stops and how quickly it must return; the risk assessment asks what is likely to stop it. JHA needs both. For example, the BIA identifies dialysis as a service that cannot be missed for long, and the risk assessment identifies transport disruption as a likely cause of missed sessions. Together they point to a specific strategy: alternative transport arrangements.

The process is also iterative. Findings from later chapters should update earlier outputs. If the BIA in eBook 2 changes a service's tier, revisit the objectives and risk ratings that depend on it. If an exercise disproves an assumption, the assumptions register, and the plans built on it should change. A BCMS that never revisits its foundations will drift away from reality.

## Key Outputs

**Table 11.1: Key Outputs of Understanding Your Organisation for Jamiyah Home for the Aged**

| **Chapter** | **Key Output** | **ISO 22301 Clause** | **Regulatory Relevance** |
| --- | --- | --- | --- |
| **1** | **Shared understanding of BCM; leadership endorsement** | **5.1** | **Shows MSF that leaders own resident protection and incident management** |
| **2** | **Operational profile: services, people, premises, dependencies** | **4.1** | **Records welfare-home status and MSF's role as admitting authority** |
| **3** | **BCM goals G1–G6; draft BC policy** | **5.2** | **Aligns goals with resident safety and licensing expectations** |
| **4** | **Measurable objectives O1–O8 with owners and dates** | **6.2** | **Provides evidence of planned, monitored improvement** |
| **5** | **Approved assumptions register A1–A7** | **6.1; 8.2** | **Ensures relocation plans assume MSF involvement** |
| **6** | **BCM organisation chart, responsibility table, terms of reference** | **5.3; 7.2; 7.3** | **Clarifies who reports incidents and liaises with MSF** |
| **7** | **Context register; interested parties register** | **4.1; 4.2** | **Captures licensing, incident management and public health requirements** |
| **8** | **BCMS scope, methodology and roadmap** | **4.3; 4.4; 8.1** | **Defines coverage of all licensed services at the premises** |
| **9** | **Risk register R1–R12 with treatments and owners** | **6.1; 8.2.3** | **Addresses resident safety, infection control and governance risks** |
| **10** | **Prioritised critical services CBF-1 to CBF-17 with recovery tiers** | **8.2.2** | **Focuses protection on care that MSF expects homes to maintain** |

## Readiness Checklist

Before starting eBook 2, JHA should confirm the following:

- The Superintendent and Jamiyah Singapore's board have endorsed the BCM programme.
- Department heads have reviewed the operational profile and noted gaps in staffing, systems, and supplier information for the BIA.
- Goals G1–G6 and the BC policy have been approved and communicated to staff.
- Objectives O1–O8 have confirmed owners, dates and measures.
- Assumptions A1–A7 have been reviewed, adjusted where needed and approved.
- The steering committee, BCM coordinator, incident roles and deputies have been appointed.
- The context and interested parties registers have been completed, including the requirements of the new licensing regime.
- The BCMS scope has been approved and any exclusions justified.
- The risk register has been confirmed in departmental workshops, with an owner for every high or very high risk.
- The list of 17 critical services has been accepted as the BIA agenda.
- All eBook 1 outputs are under document control, with owners, versions and review dates.
- Records are organised so that an internal auditor could trace each output to its approval.

## Conclusion

Four lessons stand out from eBook 1. First, JHA's continuity programme must start and end with residents: their safety, care, and dignity are the measure of success, including their religious practice and mental well-being, not only their physical needs. Second, JHA already has strong foundations, notably a list of critical services with recovery tiers, which gives it a head start on the BIA. Third, a handful of shared vulnerabilities, including staff numbers, the single site and a few key suppliers, sit behind many of the highest risks, so addressing them will strengthen several services at once. Fourth, MSF's role as regulator and admitting authority runs through every stage, from goals and assumptions to relocation and incident reporting, so continuity plans must include MSF in the decision path.

### Looking Ahead to Implementing Business Continuity Management for Jamiyah Home for the Aged

eBook 2 turns understanding into capability. It begins with the BIA, which will confirm the tiers of JHA's critical services and set their tolerable disruption periods and minimum service levels. It then moves to business continuity strategies and solutions under clause 8.3, such as cross-training, standby suppliers, backup utilities and relocation arrangements. Business continuity plans and procedures under clause 8.4 will set out who does what, in what order, for each critical service.

eBook 2 will also cover the exercise programme under clause 8.5, through which JHA will test whether its plans actually work, starting with tabletop discussions and moving to live exercises. Throughout, the outputs of eBook 1 will be put to work: the goals will guide choices between competing strategies, the assumptions will set the conditions each plan must withstand, the team structure will assign an owner to each plan, and the risk register will show which threats each strategy must address. Where eBook 2's findings contradict eBook 1, the team will update the earlier outputs rather than defend them. Finally, it will address performance evaluation under clause 9, including monitoring, internal audit and management review, and improvement under clause 10, through which lessons from exercises and real incidents feed back into the BCMS.

For the board, the practical message is simple. Over the next 12 months, we will need management time, some investment in standby arrangements, and a willingness to test plans honestly, including exercises that reveal weaknesses. Those findings are the point of the exercise, not a sign of failure, and they are how JHA will turn a sound plan on paper into dependable care for its residents.

eBook 1 makes that implementation credible: Jamiyah Home for the Aged now knows what it must protect, why, and against what.

**Continue reading:** Chapter 12, *Back Cover of Understanding Your Organisation for Jamiyah Home for the Aged*, summarises this eBook and introduces BCM Institute's ISO 22301 courses for BCM coordinators.

 

---

## **Comments**

![CTA Banner\_OR](https://blog.bcm-institute.org/hubfs/CTA%20Banner%20for%20Blog/CTA%20Banner_OR.jpg "CTA Banner_OR")

---

![CTA Banner\_ORA](https://blog.bcm-institute.org/hubfs/CTA%20Banner%20for%20Blog/CTA%20Banner_ORA.jpg "CTA Banner_ORA")

---

![CTA Banner\_BCM](https://blog.bcm-institute.org/hubfs/CTA%20Banner%20for%20Blog/CTA%20Banner_BCM.jpg "CTA Banner_BCM")

---

![CTA Banner\_ITDR](https://blog.bcm-institute.org/hubfs/CTA%20Banner%20for%20Blog/CTA%20Banner_ITDR.jpg "CTA Banner_ITDR")

---

![CTA Banner\_CM](https://blog.bcm-institute.org/hubfs/CTA%20Banner%20for%20Blog/CTA%20Banner_CM.jpg "CTA Banner_CM")

![BCMIWhiteLogoSmall.png](https://blog.bcm-institute.org/hs-fs/hubfs/Blog%20Testing/BCMIWhiteLogoSmall.png?width=72&name=BCMIWhiteLogoSmall.png "BCMIWhiteLogoSmall.png")

All rights reserved. Copyright 2026

```json
{
  "@context" : "https://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Moh Heng Goh",
    "url" : "https://blog.bcm-institute.org/bcm-v2/author/moh-heng-goh"
  },
  "dateModified" : "2026-11-03T07:21:19.072Z",
  "datePublished" : "2026-11-03T07:21:19.000Z",
  "headline" : "[BCM] [JHA] [E1] [C11] Summary of Understanding Your Organisation for Jamiyah Home for the Aged",
  "mainEntityOfPage" : {
    "@id" : "https://blog.bcm-institute.org/bcm-v2/bcm-jha-e1-chapter-11-summary-of-understanding-your-organisation-for-jamiyah-home-for-the-aged",
    "@type" : "WebPage"
  },
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "url" : "https://blog.bcm-institute.org/hubfs/BCMI%20Logo.png"
    },
    "name" : "BCMI Pte Ltd"
  }
}
```