# [\[BCM\] \[EGH\] \[E2\] \[C4\] Business Impact Analysis Phase for Business Continuity Management Planning Methodology for Eastern General Hospital](https://blog.bcm-institute.org/bcm-v2/bcm-egh-e2-c4-business-impact-analysis-phase-for-business-continuity-management-planning-methodology-for-eastern-general-hospital)

 Written by [Moh Heng Goh](https://blog.bcm-institute.org/bcm-v2/author/moh-heng-goh) | Nov 17, 2026, 5:20:43 AM

## Introduction

The Business Impact Analysis (BIA) is the third phase of the methodology. Where risk analysis asks what might happen, the BIA asks what it would do to Eastern General Hospital (EGH) if it did. It identifies the critical business functions (CBFs) that must be protected, measures how quickly harm grows when each one stops, and sets the recovery targets that strategies must meet.

This chapter explains what the BIA measures, how it is carried out, and what is particular to a hospital that is still being built. It uses sixteen CBFs, coded CBF-1 to CBF-16, supplied by EGH for this eBook. All tiers, recovery times and dependencies are illustrative, and EGH must confirm them with the clinical and support teams that own each function.

## What the BIA Measures

### Impact Over Time

The core of the BIA is the way impact grows with time. A short interruption to outpatient appointments may inconvenience patients. A short interruption to critical care may cost lives. For each function the analysis asks what happens after one hour, four hours, a day, three days and a week, and rates the effect on patient safety, clinical outcomes, regulatory standing, finances, staff and reputation. Patient safety should carry the most weight.

### The Key Measures

- **Maximum tolerable period of disruption (MTPD):** the time after which the harm from stopping the function becomes unacceptable.
- **Recovery time objective (RTO):** the target time to restore the function, set shorter than the MTPD so that a margin remains.
- **Minimum business continuity objective (MBCO):** the minimum level of service acceptable during recovery. For a ward, this might be a reduced bed count with essential nursing care.
- **Recovery point objective (RPO):** the maximum acceptable loss of data, measured as time. For electronic medication records, a very short RPO would be expected.
- **Dependencies:** the people, premises, technology, equipment, suppliers and other functions that each CBF needs to operate.

## How the BIA Is Carried Out

The business unit BCM coordinators lead the BIA for their own areas, supported by the project manager. A standard questionnaire, kept identical for all units, is completed in a short workshop with the head of unit and senior clinicians. The steps are:

1. **Confirm the list of functions.** Each function is described in a sentence, its owner is named and it is matched to the opening stage in which it starts.
2. **Rate impact over time.** The workshop estimates impacts at the time points above, using the scale from Chapter 3 for consistency.
3. **Set MTPD, RTO, MBCO and RPO.** Targets are proposed, challenged and agreed.
4. **Record dependencies.** The group lists every resource the function needs, and which other functions it relies on.
5. **Consolidate and rank.** The project manager combines results, assigns tiers and tests them for consistency, for example checking that no function has a shorter RTO than a function it depends on.
6. **Approve.** The steering committee accepts the results.

Dependencies deserve particular attention. In a hospital, the apparent owner of a function is seldom the only one that matters. An operating theatre depends on medical gases, sterile supply, power and the clinical information systems. If the information systems have an RTO of four hours but the theatre needs them within two, the numbers contradict, and one of them must change. Finding such conflicts is one of the main benefits of the analysis.

## Tiers Used in This eBook

To make later chapters simpler, the illustrative analysis groups functions into three tiers by RTO:

- **Tier 1:** RTO of four hours or less. These functions affect life or immediate safety.
- **Tier 2:** RTO of more than four and up to 24 hours.
- **Tier 3:** RTO of more than 24 and up to 72 hours.

On this basis, ten of the sixteen functions fall in Tier 1 (CBF-1, CBF-2, CBF-3, CBF-4, CBF-5, CBF-6, CBF-10, CBF-11, CBF-12 and CBF-16), five fall in Tier 2 (CBF-7, CBF-9, CBF-13, CBF-14 and CBF-15) and one falls in Tier 3 (CBF-8). The Summary Table below gives all values. Note that a Tier 3 rating does not mean a function is unimportant. Specialist outpatient care matters greatly to patients, but a delay of two days is usually less harmful than a delay of two hours in critical care.

## Requirements Specific to EGH

### Regulatory Deadlines

Acute hospital services in Singapore are regulated by the Ministry of Health (MOH) under the Healthcare Services Act 2020 (HCSA), with the Healthcare Services (General) Regulations 2021 and the Healthcare Services (Acute Hospital Service) Regulations 2023. MOH licence conditions for acute hospital licensees include, for emergency department services, a condition requiring policies for promptly deploying qualified personnel, for segregating patients with highly infectious disease or hazardous material contamination, and for prompt resuscitation of patients with time-sensitive conditions. These policies must be regularly reviewed. The BIA for the emergency department (CBF-1) and for infection prevention (CBF-10) should therefore record how the recovery targets support these policies. Separate conditions require licensees to keep resuscitation drugs and equipment on site at all times, which makes pharmacy and medication management (CBF-6) and clinical support supplies (CBF-9) regulatory as well as clinical concerns. Whether EGH holds a licence has not been confirmed in the sources used here.

### Service Cycles

Hospital demand follows patterns: emergency attendances peak at certain hours, theatre lists run on schedules, discharge rounds cluster in the morning and laboratory work peaks after morning clinics. The BIA should record such cycles because the same outage causes different harm at different times. An imaging failure during a busy theatre list differs from one at night.

### Staged Opening

EGH's website states that the hospital will begin serving patients virtually in 2026, with the physical campus due in 2029 to 2030. The BIA must therefore be run more than once. The first pass covers virtual and home-based care (CBF-7) and supporting digital platforms (CBF-12). Later passes add physical services as they are commissioned, and each new service should be analysed before its opening date. Estimates made before real patient volumes exist should be marked as assumptions and revisited after the first months of operation.

### Shared Dependencies

Several functions share the same dependency, and this concentration is itself a finding. Power and building systems (CBF-11) underpin nearly all Tier 1 functions. Clinical information systems (CBF-12) underpin ordering, results, medication and records. Patient flow and transfer to community care (CBF-13) depends on bed availability at Eastern Community Hospital, which is run by SingHealth Community Hospitals as part of the same campus. If transfers stop, acute beds fill, and the emergency department (CBF-1) is affected within hours. These shared dependencies should be listed in the BIA and carried into strategies in Chapter 5.

## Using the Results

The BIA results have four uses. They rank which functions to protect first, set targets for strategies, tell the plan writers how fast each function must be recovered, and give exercise planners a basis for scenarios. They also give the steering committee evidence for investment decisions, such as whether to fund a second power feed. Results should be reviewed whenever the service model changes, and at least once a year after the hospital is open.

## Summary Table

All values are illustrative and must be confirmed by EGH.

| **Code** | **Critical business function** | **Tier** | **RTO** | **MTPD** | **Main dependency** |
| --- | --- | --- | --- | --- | --- |
| **CBF-1** | **Emergency Department Services** | **1** | **1 hour** | **4 hours** | **Power and emergency department staff** |
| **CBF-2** | **Inpatient ward care** | **1** | **2 hours** | **8 hours** | **Nursing staff and power** |
| **CBF-3** | **Operating theatre services** | **1** | **4 hours** | **12 hours** | **Medical gases and sterile supply** |
| **CBF-4** | **Critical care** | **1** | **1 hour** | **2 hours** | **Power, gases and ventilators** |
| **CBF-5** | **Diagnostic imaging and laboratory services** | **1** | **4 hours** | **24 hours** | **Imaging equipment and laboratory systems** |
| **CBF-6** | **Pharmacy and medication management** | **1** | **4 hours** | **24 hours** | **Pharmacy stock and e-prescribing** |
| **CBF-7** | **Virtual and home-based care** | **2** | **12 hours** | **48 hours** | **Network and digital platform** |
| **CBF-8** | **Outpatient specialist care** | **3** | **48 hours** | **5 days** | **Clinic space and appointment system** |
| **CBF-9** | **Clinical support supplies** | **2** | **12 hours** | **48 hours** | **Supplier deliveries** |
| **CBF-10** | **Infection prevention and outbreak response** | **1** | **2 hours** | **8 hours** | **Isolation capacity and infection prevention team** |
| **CBF-11** | **Facilities, utilities and building systems** | **1** | **1 hour** | **4 hours** | **Utilities and building management systems** |
| **CBF-12** | **Clinical information systems and digital platforms** | **1** | **4 hours** | **12 hours** | **Data centre and network** |
| **CBF-13** | **Patient flow and transfer to community care** | **2** | **12 hours** | **48 hours** | **Community hospital bed availability** |
| **CBF-14** | **Workforce deployment and staff welfare** | **2** | **8 hours** | **24 hours** | **Rostering system and transport** |
| **CBF-15** | **Logistics, food, linen and waste services** | **2** | **24 hours** | **72 hours** | **Contractors** |
| **CBF-16** | **Security, safety and crisis communications** | **1** | **1 hour** | **4 hours** | **Communications and security systems** |

The BIA turns a general concern for continuity into specific targets. For EGH, the illustrative results rank ten functions as Tier 1, five as Tier 2 and one as Tier 3, and they show how strongly facilities, information systems and community transfers influence the rest. Because the hospital will open in stages, the analysis should be repeated as services are added, and early assumptions should be checked against real activity. The next chapter takes these targets and shows how to choose strategies that meet them.

## Sources

- [MOH, Licence Conditions on Acute Hospital Service Licensees, version 1.0](https://isomer-user-content.by.gov.sg/7/778fe29b-fbad-4918-ad2c-67162f04a991/LCs%20on%20Acute%20Hospital%20Service%20Licensees_1.0.pdf), section 11.1 on the emergency department service. The effective date is not stated in the text read.
- [MOH, Licence Conditions on Emergency Life Saving Measures, version 1.0](https://isomer-user-content.by.gov.sg/7/c9eb5682-75e3-4537-b017-93f6a6768eef/lcs-on-emergency-life-saving-measures_1-0.pdf).
- [Eastern General Hospital, Hospital Overview](https://www.egh.com.sg/about-egh/hospital-overview/).

**Continue reading:** Chapter 5, *Business Continuity Strategy Phase for Business Continuity Management Planning Methodology for Eastern General Hospital*, which shows how to choose prevention, mitigation and recovery strategies that meet these targets.

 

| Keeping Care Running: Managing and Implementing Business Continuity Management at Eastern General Hospital |  |  |  |  |
| --- | --- | --- | --- | --- |
| **eBook 2: Implementing Business Continuity Management** |  |  |  |  |
| **C1** | **C2** | **C3** | **C4** | **C5** |
|  |  |  |  |  |
| **C6** | **C7** | **C8** | **C9** | **C10** |
|  |  |  |  |  |
|  |  |  |  |  |

[View full post](https://blog.bcm-institute.org/bcm-v2/bcm-egh-e2-c4-business-impact-analysis-phase-for-business-continuity-management-planning-methodology-for-eastern-general-hospital)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Moh Heng Goh"
  },
  "dateModified" : "2026-11-17T07:00:37.949Z",
  "datePublished" : "2026-11-17T05:20:43Z",
  "headline" : "[BCM] [EGH] [E2] [C4] Business Impact Analysis Phase for Business Continuity Management Planning Methodology for Eastern General Hospital",
  "image" : {
    "@type" : "ImageObject",
    "height" : 60,
    "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
    "width" : 60
  },
  "mainEntityOfPage" : "https://blog.bcm-institute.org/bcm-v2/bcm-egh-e2-c4-business-impact-analysis-phase-for-business-continuity-management-planning-methodology-for-eastern-general-hospital",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60,
      "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
      "width" : 60
    },
    "name" : "BCM v2"
  }
}
```