title: "[BCM] [EGH] [E1] [C11] Summary of Understanding Your Organisation for Eastern General Hospital"
description: "A summary of eBook 1 for EGH: key outputs of Chapters 1 to 10, how they fit together, a readiness checklist and a preview of ISO 22301 implementation."
---

.

[![BCMIWhiteLogo.png](https://blog.bcm-institute.org/hs-fs/hubfs/Blog%20Testing/BCMIWhiteLogo.png?width=556&name=BCMIWhiteLogo.png "BCMIWhiteLogo.png")](http://www.bcm-institute.org/)

- [Home](https://www.bcm-institute.org/)
- [About Us](https://www.bcm-institute.org/about-us-3/) 
    - [A President’s Perspective](https://www.bcm-institute.org/about-us/a-presidents-perspective/)
    - [Our History](https://www.bcm-institute.org/about-us/our-history/)
    - [Our Advisory Council](https://www.bcm-institute.org/about-us/our-advisory-council/)
    - [Customers’ Testimonials](https://www.bcm-institute.org/about-us/customers-testimonials/)
    - [Credential Verification](https://www.bcm-institute.org/about-us/credential-verification/)
- [Courses](https://blog.bcm-institute.org/blog/course-fees-for-blended-learning-courses-master-catalog) 
    - [ISO 22301 Business Continuity Management System Audit](https://blog.bcm-institute.org/audit/business-continuity-management-audit-courses)
    - [ISO 22301 Business Continuity Management](https://blog.bcm-institute.org/bcm/business-continuity-management-courses)
    - [Crisis Communication](https://blog.bcm-institute.org/crisis-communication/crisis-communication-courses)
    - [Crisis Management](https://blog.bcm-institute.org/en/crisis-management/courses)
    - [IT Disaster Recovery](https://blog.bcm-institute.org/it-disaster-recovery/courses)
    - [Operational Resilience](https://blog.bcm-institute.org/operational-resilience/courses)
    - [Operational Resilience Audit](https://blog.bcm-institute.org/operational-resilience-audit/courses)
- [Certification](https://blog.bcm-institute.org/certification/types-of-certifications-offered) 
    - [ISO 22301 BCMS Audit Certification](https://blog.bcm-institute.org/certification/business-continuity-management-audit-certification)
    - [ISO22301 Business Continuity Management Certification](https://blog.bcm-institute.org/bcm/business-continuity-management-certification)
    - [Crisis Communication Certification](https://blog.bcm-institute.org/crisis-communication/crisis-communication-certification)
    - [Crisis Management Certification](https://blog.bcm-institute.org/en/crisis-management/crisis-management-certification)
    - [IT Disaster Recovery Planning Certification](https://blog.bcm-institute.org/it-disaster-recovery/it-disaster-recovery-certification)
    - [Operational Resilience Certification](https://blog.bcm-institute.org/operational-resilience/operational-resilience-certification)
    - [Operational Resilience Audit Certification](https://blog.bcm-institute.org/operational-resilience-audit)
- [Seminars](https://blog.bcm-institute.org/meet-the-expert/mte-webinar-mainpage)
- [Store](https://www.bcm-institute.org/store-2/)
- [Contact Us](http://www.bcm-institute.org/about-us/contact-us/)

- <https://www.facebook.com/BCMInstitute/>
- <https://www.linkedin.com/company/business-continuity-management-institute-bcm-institute>

###### Keeping Care Running: Managing and Implementing Business Continuity Management at Eastern General Hospital

![CC Ai Gen\_with Cert Logo 1](https://blog.bcm-institute.org/hs-fs/hubfs/BB%20CC%20%5BAi%20Gen%20Blog%20Photo%5D/CC%20Ai%20Gen_with%20Cert%20Logo%201.jpg?width=3000&height=2000&name=CC%20Ai%20Gen_with%20Cert%20Logo%201.jpg "CC Ai Gen_with Cert Logo 1")

# \[BCM\] \[EGH\] \[E1\] \[C11\] Summary of Understanding Your Organisation for Eastern General Hospital

[![New call-to-action](https://no-cache.hubspot.com/cta/default/3893111/dfa53785-5be1-4117-a1bc-43e40cdb42e8.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/dfa53785-5be1-4117-a1bc-43e40cdb42e8)

This is the closing chapter of eBook 1, *Understanding Your Organisation for Eastern General Hospital*, in the three-eBook series *Keeping Care Running: Managing and Implementing Business Continuity Management at Eastern General Hospital*. The series guides Eastern General Hospital (EGH, [www.egh.com.sg](https://www.egh.com.sg)) towards a business continuity management system (BCMS) that conforms to ISO 22301:2019 with Amendment 1:2024. It must also meet any continuity expectations of the Ministry of Health (MOH) in Singapore.

[Moh Heng Goh](https://blog.bcm-institute.org/bcm-v2/author/moh-heng-goh) Nov 17, 2026

#### **[![New call-to-action](https://no-cache.hubspot.com/cta/default/3893111/c5748bd7-2a18-4a78-8cc9-7dcc65204af9.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/c5748bd7-2a18-4a78-8cc9-7dcc65204af9)**

## [![New call-to-action](https://no-cache.hubspot.com/cta/default/3893111/d9e168e3-ac3e-49f1-96f8-fdf9b11bf195.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/d9e168e3-ac3e-49f1-96f8-fdf9b11bf195)

## Introduction

This is the closing chapter of eBook 1, *Understanding Your Organisation for Eastern General Hospital*, in the three-eBook series *Keeping Care Running: Managing and Implementing Business Continuity Management at Eastern General Hospital*. The series guides Eastern General Hospital (EGH, [www.egh.com.sg](https://www.egh.com.sg)) towards a business continuity management system (BCMS) that conforms to ISO 22301:2019 with Amendment 1:2024. It must also meet any continuity expectations of the Ministry of Health (MOH) in Singapore.

Understanding the organisation comes before implementation because ISO 22301 clause 4 makes context the foundation of the BCMS. A plan written without knowing the services, dependencies, interested parties and regulatory setting will protect the wrong things. For EGH, the point is sharper. It is a new acute hospital, owned within the SingHealth cluster, licensed by MOH under the Healthcare Services Act 2020 (HCSA) \[verify\] once it provides acute hospital service, and still being built. Continuity can therefore be designed in and not added afterwards.

MOH is the primary regulator, and its expectations shape what the continuity programme must show. The Healthcare Services Act, its regulations and the licence conditions set legal duties, while ISO 22301 is a voluntary standard that EGH can use as the structure for meeting and evidencing them. Singapore has no national BCM policy for hospitals, so a clear, documented BCMS is also the way EGH can explain to MOH, SingHealth and its own board how it manages disruption.

This chapter summarises Chapters 1 to 10, shows how they fit together, lists the outputs in a table, offers a readiness checklist and looks ahead to eBook 2. Readers who have skipped chapters can use it as a map, and readers who have read them all can use it as a checklist of what must now be in place.

## Chapter-by-Chapter Summary

### Chapter 1: Overview of Business Continuity Management for Eastern General Hospital

Chapter 1 introduced business continuity management (BCM), the BCMS and the difference between BCM and emergency response. It rests on the leadership expectations in clause 5.1 of ISO 22301:2019, which ask top management to show commitment.

The key output is a shared understanding of BCM and leadership endorsement. For example, EGH's executive team might agree that continuity work begins before the campus opens, so that each service is tested before patients arrive.

### Chapter 2: Understanding Your Organisation for Eastern General Hospital

Chapter 2 mapped EGH's purpose, services, premises, people, technology and suppliers, linked to clause 4.1. It highlighted three operating states: virtual and home-based care today, a transition period, and the full campus from 2029.

The key output is an operational profile. For instance, SingHealth@Home depends on telecommunications and remote monitoring, which are dependencies that a continuity plan must address.

### Chapter 3: Establishing Organisational Goals for BCM for Eastern General Hospital

Chapter 3 set six illustrative goals, G1 to G6, and a draft business continuity policy under clause 5.2. It noted that Singapore has no national BCM policy for hospitals.

The key output is a set of goals and a draft policy. For example, goal G5, to build resilience into the design, reflects SingHealth's statement that campus spaces can be converted quickly in an outbreak.

### Chapter 4: Establishing BCM Objectives for Eastern General Hospital

Chapter 4 turned goals into eight objectives, O1 to O8, with owners and measures, under clause 6.2. The objectives cover policy approval, business impact analyses, recovery targets, design reviews, training, exercises, suppliers and review.

The key output is a set of measurable objectives. For example, EGH might aim for every department to complete a business impact analysis (BIA) before its service opens.

### Chapter 5: Determining BCM Assumptions for Eastern General Hospital

Chapter 5 recorded seven planning assumptions, A1 to A7, linked to clauses 6.1 and 8.2. They cover staff absence, premises, utilities, technology, suppliers, patient demand and external support.

The key output is an assumptions register. For example, assumption A4 states that core clinical systems may be unavailable, which leads to downtime exercises for the electronic medical record.

### Chapter 6: Composing BCM Team for Eastern General Hospital

Chapter 6 proposed a team running from the governing body and steering committee to the BCM coordinator, department representatives and the incident management team. It relates to clauses 5.3, 7.2 and 7.3.

The key output is an organisation chart, a responsibility matrix and terms of reference. For example, a theatre manager might serve as department representative and supply the practical input for the BIA.

### Chapter 7: Analysing Operating Environment for Eastern General Hospital

Chapter 7 examined the regulatory, cluster, technology, climate, public health and construction setting under clauses 4.1 and 4.2. It also considered the climate change consideration in Amendment 1:2024.

The key output is a context register and an interested parties register. For instance, MOH, SingHealth, patients and the main contractor are all recorded with their expectations.

### Chapter 8: Implementing the BCM Planning Methodology for Eastern General Hospital

Chapter 8 set out seven phases: Project Management, Risk Analysis and Review, Business Impact Analysis, Business Continuity Strategy, Plan Development, Testing and Exercising, and Program Management. They map to clauses 4.3, 4.4, 8.1 and beyond.

The key output is the BCMS scope, methodology and implementation roadmap. For example, EGH might admit each new campus service into the BCMS as it opens.

### Chapter 9: Assessing Risks and Threats for Eastern General Hospital

Chapter 9 explained how to identify, analyse and treat risks of disruption under clause 8.2.3, and separated them from the risks to the BCMS itself under clause 6.1. It included scales, a risk matrix and a register of twelve illustrative risks, R1 to R12.

The key output is a risk register with treatments and owners. For example, risk R1 covers ransomware against clinical systems, informed by the 2018 attack on SingHealth.

### Chapter 10: Identifying Critical Business Functions for Eastern General Hospital

Chapter 10 introduced BCM terms, the regulatory and governance context, and the structure of ISO 22301. It proposed 16 preliminary critical business functions, CBF-1 to CBF-16, under clause 8.2.2.

The key output is a prioritised list of critical business functions, which the BIA will confirm. For example, emergency care (CBF-1) and critical care (CBF-4) carry a High indicative priority.

## How the Chapters Fit Together

1. **Understand (Chapters 1 and 2):** agree what BCM is and what EGH does.
2. **Set direction (Chapters 3 to 5):** define goals, objectives and assumptions.
3. **Organise (Chapter 6):** form the BCM team and assign roles.
4. **Frame (Chapters 7 and 8):** analyse the environment and fix the scope and method.
5. **Analyse (Chapters 9 and 10):** assess risks and identify critical business functions.
6. **Implement (eBook 2):** choose strategies, write plans and run exercises.

Each output feeds the next. The goals guide the objectives, the assumptions limit the plans and the team owns the work. The context and methodology give the analysis its scope, and the analysis supplies what the strategies in eBook 2 will protect.

Risk assessment and BIA complement each other. The BIA asks how bad a loss would be and how quickly the impact grows. The risk assessment asks what could cause the loss and how likely it is. Together they tell EGH what to protect first and which threats most justify investment.

The process is iterative. Later findings should update earlier outputs. For example, a BIA may show that a function is more urgent than first thought, which in turn changes the risk ratings, the objectives and the assumptions.

### Themes that run through the chapters

Four themes recur across the ten chapters. The first is patient safety, which anchors the goals, the impact scales and the priority order of the critical business functions. The second is the stage of development: EGH is a hospital in transition, so every chapter treats its operating model as planned or illustrative and recommends review at each campus phase. The third is dependence on others. SingHealth, the One SingHealth centres, suppliers, utilities and the main contractor all appear in the registers because each can limit what EGH can do. The fourth is evidence. Every output in this eBook should be replaced or confirmed by EGH's own data, such as staffing figures, system designs and licence conditions, before it is relied upon.

These themes also explain what this eBook does not do. It does not set recovery targets, because those must come from the BIA and clinical judgement. It does not choose strategies, because those depend on the analysis. And it does not claim that EGH has a particular system or control in place, because the hospital is still being built. What it provides is a structure, a vocabulary and a set of starting points that EGH can test and improve.

## Key Outputs

**Table 11.1: Key Outputs of Understanding Your Organisation for Eastern General Hospital**

| **Chapter** | **Key Output** | **ISO 22301 Clause** | **Regulatory Relevance** |
| --- | --- | --- | --- |
| **1** | **Shared understanding of BCM; leadership endorsement** | **5.1** | **Shows MOH that top management owns continuity** |
| **2** | **Operational profile of services, premises, people, technology and suppliers** | **4.1** | **Supports accurate description of the licensed service** |
| **3** | **BCM goals and draft BC policy** | **5.2** | **Aligns goals with HCSA patient-safety expectations \[verify\]** |
| **4** | **Measurable objectives with owners and dates** | **6.2** | **Evidence of a managed programme** |
| **5** | **Approved planning assumptions register** | **6.1; 8.2** | **Documents the basis for emergency readiness** |
| **6** | **BCM organisation chart, responsibility matrix and terms of reference** | **5.3; 7.2; 7.3** | **Clear accountability for governance and incident roles** |
| **7** | **Context register and interested parties register** | **4.1; 4.2** | **Records legal and regulatory requirements** |
| **8** | **BCMS scope, methodology and implementation roadmap** | **4.3; 4.4; 8.1** | **Shows a structured approach for licensing and audit** |
| **9** | **Risk register with treatments and owners** | **6.1; 8.2.3** | **Addresses cyber, data protection and outbreak risks** |
| **10** | **Prioritised critical business functions** | **8.2.2** | **Links priorities to continuity of acute services** |

## Readiness Checklist

EGH should confirm the following before starting eBook 2.

- The executive team has endorsed the BCM programme and the BCMS scope.
- The operational profile in Chapter 2 has been checked against EGH's own records.
- The BC policy has been approved, communicated and made available to interested parties.
- The BCM objectives have named owners, measures and dates.
- The planning assumptions register has been approved and has review dates.
- The BCM coordinator and deputies are appointed, and the steering committee has terms of reference.
- The context register and interested parties register record legal and regulatory requirements, including the full HCSA licence conditions.
- The planning methodology and roadmap are agreed, including how each campus phase enters the BCMS.
- The risk register has owners, treatments and a review cycle.
- The critical business functions have been reviewed by clinical leads and are ready for the BIA.
- Document control rules exist for BCMS records, with version control and retention.
- Internal audit has been told of the programme and can plan its first review.

## Conclusion

Four lessons stand out for EGH. First, patient safety is the anchor for every goal and priority. Second, the stage of development is an opportunity, since continuity requirements can shape design, commissioning and culture. Third, dependence on digital platforms and shared services calls for downtime procedures and clear ownership. Fourth, ownership matters, because plans only work when named people hold them.

These lessons also set the tone for implementation. EGH should resist the urge to write long plans early. Short, tested, role-based plans for the most critical functions will protect patients better than a large library nobody has read.

### Looking Ahead to Implementing Operational Resilience for Eastern General Hospital

The next eBook, *Implementing Operational Resilience for Eastern General Hospital*, moves from understanding to implementation. It will cover continuity strategies and solutions (clause 8.3), business continuity plans and procedures (clause 8.4), the exercise programme (clause 8.5), performance evaluation (clause 9) and improvement (clause 10).

Strategies will draw on the critical business functions and risks identified here. For each prioritised activity, eBook 2 will help EGH decide how to protect it and recover it: resilience built into the design, alternative capacity within SingHealth, manual workarounds, reserve stocks, alternative suppliers and agreements with partners. Plans and procedures will then turn those strategies into documents that a duty manager can use at three in the morning.

The exercise programme will test whether the plans work, and performance evaluation will give leaders evidence about how the BCMS is doing. Internal audit and management review will check conformity with ISO 22301, and improvement actions will close the gaps found. EGH may also consider whether to seek certification, which is a voluntary step that some hospitals take to show confidence to partners and regulators. That decision belongs to EGH's leadership and does not change the legal duties described in Chapter 10.

Before eBook 2 begins, EGH should also take care of practical matters. A named sponsor should hold the budget, the BCM coordinator should have the time to lead, and department heads should agree to release staff for workshops. These conditions, more than any template, decide whether implementation succeeds.

The work in eBook 1 gives EGH the context, direction, structure and analysis that make that implementation credible.

**Continue reading:** Chapter 12, *Back Cover of Understanding Your Organisation for Eastern General Hospital*, introduces BCM Institute's expert training and the next steps in the series.

 

| Keeping Care Running: Managing and Implementing Business Continuity Management at Eastern General Hospital |  |  |  |  |  |
| --- | --- | --- | --- | --- | --- |
| **eBook 1: Understanding Your Organisation** |  |  |  |  |  |
| **C1** | **C2** | **C3** | **C4** | **C5** | **C6** |
| [![\[BCM\] \[EGH\] \[E1\] \[C1\] Overview of BCM Case Study](https://no-cache.hubspot.com/cta/default/3893111/4fadfc5a-aaef-4a8d-9e12-73a4962607a3.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/4fadfc5a-aaef-4a8d-9e12-73a4962607a3) | [![\[BCM\] \[EGH\] \[E1\] \[C2\] Understanding Your Organisation](https://no-cache.hubspot.com/cta/default/3893111/91481e02-5830-45d2-9792-b5ac62d31648.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/91481e02-5830-45d2-9792-b5ac62d31648) | [![\[BCM\] \[EGH\] \[E1\] \[C3\] Establishing Organisational Goals](https://no-cache.hubspot.com/cta/default/3893111/2399832a-3fa8-4392-b904-dbac8a9394ce.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/2399832a-3fa8-4392-b904-dbac8a9394ce) | [![\[BCM\] \[EGH\] \[E1\] \[C4\] Establishing Business Continuity Objectives](https://no-cache.hubspot.com/cta/default/3893111/ff56e4d3-ce31-4bcb-b4dc-c2dad8dc1d66.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/ff56e4d3-ce31-4bcb-b4dc-c2dad8dc1d66) | [![\[BCM\] \[EGH\] \[E1\] \[C5\] Determining BC Assumptions](https://no-cache.hubspot.com/cta/default/3893111/af5d7f28-5791-4e05-97c4-d1247b775a7f.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/af5d7f28-5791-4e05-97c4-d1247b775a7f) | [![\[BCM\] \[EGH\] \[E1\] \[C6\] Composing BCM Team](https://no-cache.hubspot.com/cta/default/3893111/d161235c-fffb-4a81-bb52-bcb5062d58ac.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/d161235c-fffb-4a81-bb52-bcb5062d58ac) |
| **C7** | **C8** | **C9** | **C10** | **C11** | **C12** |
| [![\[BCM\] \[EGH\] \[E1\] \[C7\] Analysing Operating Environment](https://no-cache.hubspot.com/cta/default/3893111/33fefd15-96cd-48e5-84c5-cc7612cf3246.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/33fefd15-96cd-48e5-84c5-cc7612cf3246) | [![\[BCM\] \[EGH\] \[E1\] \[C8\] Implementing the BCM Planning Methodology](https://no-cache.hubspot.com/cta/default/3893111/9f97be88-5011-40d8-8391-83e0dced4dba.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/9f97be88-5011-40d8-8391-83e0dced4dba) | [![\[BCM\] \[EGH\] \[E1\] \[C9\] Assessing Risks and Threats](https://no-cache.hubspot.com/cta/default/3893111/eaf1e003-d44e-438b-9bc3-f44711c2beed.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/eaf1e003-d44e-438b-9bc3-f44711c2beed) | [![\[BCM\] \[EGH\] \[E1\] \[C10\] Identifying Critical Business Functions](https://no-cache.hubspot.com/cta/default/3893111/cb4749ae-a696-4d2c-b505-28e05a8f4091.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/cb4749ae-a696-4d2c-b505-28e05a8f4091) | [![\[BCM\] \[EGH\] \[E1\] \[C11\] Summary](https://no-cache.hubspot.com/cta/default/3893111/d050e49a-b47b-4b63-90d2-2b49d7ef1a23.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/d050e49a-b47b-4b63-90d2-2b49d7ef1a23) | [![\[BCM\] \[EGH\] \[E1\] \[C12\] Back Cover](https://no-cache.hubspot.com/cta/default/3893111/8a1f3bea-63cc-48bd-81e4-a58d1f2347f9.png)](https://cta-redirect.hubspot.com/cta/redirect/3893111/8a1f3bea-63cc-48bd-81e4-a58d1f2347f9) |
|  |  |  |  |  |  |

---

## **Comments**

![CTA Banner\_OR](https://blog.bcm-institute.org/hubfs/CTA%20Banner%20for%20Blog/CTA%20Banner_OR.jpg "CTA Banner_OR")

---

![CTA Banner\_ORA](https://blog.bcm-institute.org/hubfs/CTA%20Banner%20for%20Blog/CTA%20Banner_ORA.jpg "CTA Banner_ORA")

---

![CTA Banner\_BCM](https://blog.bcm-institute.org/hubfs/CTA%20Banner%20for%20Blog/CTA%20Banner_BCM.jpg "CTA Banner_BCM")

---

![CTA Banner\_ITDR](https://blog.bcm-institute.org/hubfs/CTA%20Banner%20for%20Blog/CTA%20Banner_ITDR.jpg "CTA Banner_ITDR")

---

![CTA Banner\_CM](https://blog.bcm-institute.org/hubfs/CTA%20Banner%20for%20Blog/CTA%20Banner_CM.jpg "CTA Banner_CM")

![BCMIWhiteLogoSmall.png](https://blog.bcm-institute.org/hs-fs/hubfs/Blog%20Testing/BCMIWhiteLogoSmall.png?width=72&name=BCMIWhiteLogoSmall.png "BCMIWhiteLogoSmall.png")

All rights reserved. Copyright 2026

```json
{
  "@context" : "https://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Moh Heng Goh",
    "url" : "https://blog.bcm-institute.org/bcm-v2/author/moh-heng-goh"
  },
  "dateModified" : "2026-11-17T03:44:48.861Z",
  "datePublished" : "2026-11-17T03:44:48.000Z",
  "headline" : "[BCM] [EGH] [E1] [C11] Summary of Understanding Your Organisation for Eastern General Hospital",
  "mainEntityOfPage" : {
    "@id" : "https://blog.bcm-institute.org/bcm-v2/bcm-egh-e1-c11-summary-of-understanding-your-organisation-for-eastern-general-hospital",
    "@type" : "WebPage"
  },
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "url" : "https://blog.bcm-institute.org/hubfs/BCMI%20Logo.png"
    },
    "name" : "BCMI Pte Ltd"
  }
}
```