A Business Continuity Plan (BCM Plan) is only as strong as its ability to work effectively during a real disruption. For ASMPT, a global leader in semiconductor and electronics assembly and packaging solutions, the stakes are high—any interruption in precision manufacturing, R&D, or supply chain operations could lead to delays that ripple across its global customer base.
To ensure resilience, ASMPT must not only design and document BCM Plans but also test and exercise them regularly.
The Testing and Exercising Phase of the BCM Planning Methodology, as outlined in ISO 22301, provides ASMPT with the opportunity to validate its plans, identify gaps, and strengthen response capabilities.
By adopting a structured approach—progressing from initial (basic) tests to more advanced exercises—ASMPT can build organisational confidence, ensure staff readiness, and confirm that continuity measures are practical and effective.
Initial tests serve as the foundation for validating individual components of ASMPT’s BCM framework. They are less complex but essential in building awareness and ensuring the readiness of basic recovery elements.
These tests focus on verifying the functionality of specific recovery resources or systems.
These tests check the effectiveness of emergency contact procedures and notification systems.
Walkthroughs involve plan owners and team members reviewing procedures step-by-step to confirm roles and responsibilities.
These basic tests create a baseline of preparedness and ensure that staff are familiar with their roles in continuity response.
Once initial tests are well established, ASMPT can progress to more advanced exercises. These involve multiple teams, realistic scenarios, and end-to-end validation of recovery strategies.
Integrated tests examine how various components of the BCM Plan work together across departments or sites.
Simulation tests create realistic but controlled scenarios to evaluate response capabilities under pressure.
Live tests replicate real conditions as closely as possible and are the most rigorous form of testing.
These advanced tests not only validate the effectiveness of ASMPT’s continuity strategies but also build a resilience culture across the organisation by involving staff at all levels in realistic response scenarios.
The Testing and Exercising Phase transforms ASMPT’s BCM Plans from static documents into dynamic, proven strategies. Beginning with initial tests—such as component verification, call notifications, and walkthroughs—ASMPT builds a strong foundation of awareness and preparedness. Progressing to advanced exercises, including integrated, simulation, and live tests, enables the organisation to validate end-to-end recovery capabilities and strengthen cross-functional coordination.
For ASMPT, these exercises provide three key benefits:
Ultimately, the Testing and Exercising Phase ensures that ASMPT is not only compliant with ISO 22301 but also equipped to respond effectively to disruptions, safeguard its reputation, and maintain its position as a trusted leader in the semiconductor and electronics industry.
Resilient Operations at ASMPT: A Guide to ISO 22301 BCM Implementation |
||||
| eBook 2: Implementing Business Continuity Management |
||||
| C1 | C2 | C3 | C4 | C5 |
| C6 | C7 | C8 | C9 | C10 |
To learn more about the course and schedule, click the buttons below for the BCM-300 Business Continuity Management Implementer [BCM-3] and the BCM-5000 Business Continuity Management Expert Implementer [BCM-5].
|
Please feel free to send us a note if you have any questions. |
||